Comments from the Report:

The vessel maintained position but DP equipment class 2 capabilities were compromised.  It was noticed that there was a strong burning smell from the UPS.  The UPS was still powered up from the ships supply but it was in internal bypass.  Tests were carried out and it was noted that there was no voltage or frequency output.  The voltages on the eight external batteries were checked and all but one had 12+ Volts.  One of the batteries had 10 volts.

The replacement unit was tested extensively, and it operated satisfactorily.

Considerations of the IMCA Marine DP Committee from the Above Event:

  • The status of the UPS should be verified on pre-operational checklists.
  • Battery and UPS tests should be part of the DP annual trial programme and subject to regular maintenance.
  • It should be noted that with one diesel generator on each bus, a partial black-out may occur in case of failure. This should be included in the operational activity planning.
  • It appears the vessel responded as designed and the situation was well handled by the vessel crew.

DP Event

Published: 3 September 2019
Download: IMCA DPE 03/19

Classification:
Submit a Report

The following case studies and observations have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity.

Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators and DP technical crew in appropriately determining how to safely conduct their own operations. Any queries should be directed to IMCA at [email protected]. Members and non-members alike are welcome to contact IMCA if they have experienced DP events which can be shared anonymously with the DP industry.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.