Skip to content

Loss of DGNSS resulted in ROV being recovered – DP incident

Comments

Both the satellite positioning systems in use were from the same provider.
The report recognised this and recommended that the systems were changed so that position information was provided by different service providers. The service provider informed the operator after the event that its services experienced periods of increased latencies for just over twenty minutes on the day and time of the incident.

Considerations from the above event:

  • It would appear from the information available that the standby hydroacoustic position reference (HPR) system did not have an acoustic transponder on the seabed. In any event it was not utilised.
  • Proper consideration should always be made of the required PRS based on the specific operation and the DP equipment class of the vessel.
  • When considering redundancy of satellite systems do not just consider equipment manufacturer and software versions; the correction type and transmission method should also be different.
  • It is noted that two separate vendors could use correction details from the same source, therefore users should compare what correction type is being used.
  • In similar situations users could consider switching to raw global navigation satellite system (GNSS) data, therefore staying on DP but with a larger footprint.

DP Event

Published: 2 June 2017
Download: IMCA DPE 02/17

Classification:
Submit a Report

The following case studies and observations have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity.

Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators and DP technical crew in appropriately determining how to safely conduct their own operations. Any queries should be directed to IMCA at [email protected]. Members and non-members alike are welcome to contact IMCA if they have experienced DP events which can be shared anonymously with the DP industry.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.