Guidance on armoured umbilical life cycle management

Version history

April 2024 Rev. 1.1 – Small update to Section 4.5
October 2023 Rev. 1 – Full review and amendments in new template
January 2023 – Initial publication

Contents
  • Introduction
  • Glossary of Terms
  • Abbreviations
  • Procurement
  • Specification
  • Paperwork Requirements
  • Quality Control
  • Delivery
  • Handling, Storage and Transportation
  • Installation
  • Limitations
  • LARS Winch Drum
  • Spooling Tension
  • Spooling Equipment
  • Umbilical Anchor
  • Lubrication
  • Completion of Spooling
  • Maintenance and Inspection
  • Daily Visual Inspection
  • Periodic Inspections
  • Periodic Electrical Testing:
  • Corrosion and Environmental Conditions
  • Records
  • Umbilical Sampling
  • Offshore Worksite
  • Onshore Worksite
  • Offshore/Onshore Sample Preparation
  • Marking and Shipping
  • Destructive Test
  • Test Sample Preparation (Test House)
  • Testing
  • Reporting Results
  • Improving Umbilical Breaking Strength
  • Non-Destructive Examination of Umbilical
  • Construction Integrity
  • Crush Damage
  • Document the Visual Inspection
  • Documenting NDE Examination Anomalies
  • Discard Criteria
  • Reporting
  • References

Members should log in to access downloads
and discounted pricing on physical items.