Guidance on armoured umbilical life cycle management
Version history
April 2024 Rev. 1.1 – Small update to Section 4.5
October 2023 Rev. 1 – Full review and amendments in new template
January 2023 – Initial publication
Contents
- Introduction
- Glossary of Terms
- Abbreviations
- Procurement
- Specification
- Paperwork Requirements
- Quality Control
- Delivery
- Handling, Storage and Transportation
- Installation
- Limitations
- LARS Winch Drum
- Spooling Tension
- Spooling Equipment
- Umbilical Anchor
- Lubrication
- Completion of Spooling
- Maintenance and Inspection
- Daily Visual Inspection
- Periodic Inspections
- Periodic Electrical Testing:
- Corrosion and Environmental Conditions
- Records
- Umbilical Sampling
- Offshore Worksite
- Onshore Worksite
- Offshore/Onshore Sample Preparation
- Marking and Shipping
- Destructive Test
- Test Sample Preparation (Test House)
- Testing
- Reporting Results
- Improving Umbilical Breaking Strength
- Non-Destructive Examination of Umbilical
- Construction Integrity
- Crush Damage
- Document the Visual Inspection
- Documenting NDE Examination Anomalies
- Discard Criteria
- Reporting
- References
Members should log in to access downloads
and discounted pricing on physical items.