This Code of Practice sets out minimum requirements for the safe installation of offshore submarine power cables in the renewable energy industry.
The document covers the cable laying spread, the host vessel, the interface between them, and the methods used for laying, trenching, burial, jointing, repair, and pull-in operations.
Contents
Introduction
General requirements
Lay method
Specific requirements for cable lay
Cable burial, trenching and jetting
References
Revision
-
Rev. 0.1 - November 2023IMCA M263 reference added to Section 5.1; Page 2 and document navigation pane updated
-
Rev. - October 2023