This document provides comprehensive guidelines for lifting operations in the marine industry, including safety management, roles and responsibilities, lift categorisation, and specific considerations for subsea lifts, diving operations, lifting personnel, wind turbine components, and dismantling offshore structures.
Contents
Definitions and glossary of terms
Introduction
Summary of guidance
Personnel
Pre-lift planning
Inspection, examination and marking of lifting equipment
Executing a lift
Record keeping
References
Appendix A – Additional considerations for subsea lifts
Appendix B – Diving operations
Appendix C – Lifting personnel
Appendix D – Lifting of offshore wind turbine components
Appendix E – Dismantlement of offshore structures
Índice
Definições e glossário de termos
Introdução
Resumo de orientação
Pessoal
Planejamento pré-Içamento
Inspeção, exame e marcação de equipamentos de içamento
Execução de um Içamento
Manutenção de registro
Referências
Apêndice A – Considerações adicionais para içamentos submarinos
Apêndice B – Operações de mergulho
Apêndice C – Içamento e pessoas
Apêndice D – Içamento de componentes de turbinas eólicas offshore
Apêndice E – Descomissionamento de estruturas offshore
Revision
-
Rev. 2.1 - June 2023The document is additionally supported by the Lifting Equipment Engineers Association (LEEA), with no technical changes to the content
-
Rev. 2 - August 2022Review and update to ensure the guidelines properly cover lifting operations in the renewable energy sector contracting activities within appendix A4. Minor amendments to other sections
-
Rev. 1 - March 2018An extensive revision to all sections of the document with the inclusion of appendices on subsea lifts, diving operations, lifting personnel, lifting at extreme heights and dismantlement of offshore structures
-
Rev. - October 2007Initial publication