Code of practice for the initial and periodic examination, testing and certification of diving plant and equipment
Version History:
August 2022, Rev. 2.2 – Updated to align with the guidance contained in IMCA LR 001/IMCA SEL 022/IMCA M 194.
March 2022, Rev. 2.1 – Load test of lifting points on Man-Riding Basket/Bell (Details Sheet 3) reduced from 1.5 times SWL to 1.25 times SWL.
December 2021, Rev.2 – Updated to clarify any anomalies and bring the guidance into alignment with current industry good practice.
June 2014, Rev.1 – Updated to incorporate equipment improvements and changed operating practices since first publication.
February 1999 – Initial publication.
Contents
- Introduction
- Glossary
- Certification and Classification
- The Competent Person
- Responsibilities
- Documentation
- Planned Maintenance Systems (PMS)
- Explanation of this Document
- Index to Detail Sheets
- Appendix 1 – Detail Sheets
Members should log in to access downloads
and discounted pricing on physical items.
Related Information Notes
- COBRA Bailout System: Leakage at the Joint Between the Y-piece and the Interface Block - JFD Guidance Note
- Loosening of COBRA Handle Manifold - JFD Guidance Note
- COBRA Pre-use Procedures - JFD Guidance Note
- Summary of 2021 DESIGN Changes for Hyperbaric Rescue Unit (HRU) Life Support Packages (LSP)
- Summary of IMCA D 024 Document Changes 2021
- Summary of IMCA D 018 Document Changes 2021
- One Year Adoption Period for Updated IMCA DESIGN Suite Documents
- Manufacture of Sonardyne ‘AODC’ Diving Bell Emergency Transponders Discontinued
- JFD COBRA Safety Notice
- Release of KMDSI bulletin on cleaning and sanitising Kirby Morgan Helmets, BandMasks and Full Face Masks
- Use of composite cylinders for diving and underwater operations
- JFD product caution note relating to disposable gas conditioner cartridges for diver and chamber gas recovery systems
- Counterfeit Kirby Morgan Bandmasks (KMB 28)
- Sustained load cracking in aluminium manufactured from aluminium alloys HE30/AA6082 and AA6351
- Updated IMCA guidance on the testing of diving bell/basket hoist wire ropes
- Fitness for purpose of closed bell diver emergency recovery hoists
- The fitting of isolation valves and diffusers to trunkings on saturation diving systems
- Latex neck seals
- The evaluation and testing of the environmental control of hyperbaric evacuation systems