Example Redundancy Concept and Annual DP Trials for Vessels of IMO DP Class 2 & 3

Revised in line with industry best practice
Contents
  • List of Abbreviations
  • Introduction
  • Vessel Overview
  • Engines and Auxiliary Services
  • Power Generation
  • Power Distribution
  • Power Management System
  • Vessel Management System
  • Thrusters
  • DP Control System
  • Safety Systems
  • Overview of Tests Created by Analysis of Redundancy Concept
  • Appendix 1 – Example Annual DP Trials Report
  • Appendix 2 – Example Trials Summary Letter
Reference(s): IMCA M225
Published:November 2021
Version:Rev. 1
Grade:IMCA Recommended Practice
Category:
Tag:

Members should log in to access downloads
and discounted pricing on physical items.