A fire on any vessel is serious, and in the engine room of a DP vessel engaged in operations it should be considered very serious.
Comments
Investigation found that the turbo charger on engine No. 5 was damaged. DP position was maintained throughout.
Considerations
Sharing information on events such as this can have a big impact on safety and the submission of this report is very much appreciated.
- A fire on any vessel is serious and in the engine room of a DP vessel engaged in operations it should be considered very serious.
- The first signs of a fire in the engine room should warrant a DP yellow alert.
- Full details of the vessel power distribution are not known but consideration should be given to electrically isolate the affected engine room.
- The above two points should be covered by the vessel activity specific operating guidelines (ASOG) or well specific operating guidelines (WSOG) so that the crew is in no doubt what action to take.
- Vessel emergency drills should consist of scenarios such as this so that all crew know what to do and what will happen in similar circumstances.
- It is essential the crew know what conditions would cause an automatic activation of the fire deluge system.
Latest DP incidents
-
Know your equipment, or at least where to find the answers
During an update in the Follow Target Mode, the crew noticed an anomaly with joystick control.
DPE 02/26
1 September 2026
Observation
-
New equipment, unexpected consequences
During the operation, a loss of DGNSS correction signals was experienced across multiple vessel DGNSS units.
DPE 02/26
1 September 2026
Incident
-
A chain of small failures leads to a major consequence
While conducting cargo operations on DP a vessel experienced a partial blackout caused by an unexpected shutdown of generator 3
DPE 02/26
1 September 2026
Incident
-
Holding position, losing references
While approaching a turret-moored, weather-vaning offshore installation (FPSO), in preparation for cargo operations, a DP equipment class 2 vessel experienced significant rolling of up to 15–20° due to a long-period swell close to the vessel’s natural roll period, resulting in a resonance effect
DPE 02/26
1 September 2026
Observation
-
DP drill scenario – Loss of seawater cooling pump redundancy
Exercise scenario – Loss of seawater cooling pump redundancy
DPE 02/26
1 September 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.