Position reference problems again! The dangers of recalibrating
- DP Event
- Published on 22 December 2023
- Generated on 20 June 2025
- DPE 04/23
- 3 minute read
Undesired event
Jump to:
The dangers of recalibration. Shallow water environments pose specific challenges for hydroacoustic systems.
Overview
A diving vessel was operating in approximately 25m of water depth. Four Position Reference Systems (PRSs) were in use, two DGNSS & two HPRs, weighting of the PRSs was equal for all four selected into DP Control.
The vessel was asked to make a series of moves, during this time the HPR references both began to drift in the opposite direction to the two DGNSSs, thruster activity increased.
The DPO on duty decided to re-calibrate DGNSS#1, in doing so deselected DGNSS#1 from DP Control. This resulted in a greater weighting being applied to the HPRs. This caused the vessel to drive off position in favour of the HPR position referencing. Over the next 40 minutes, all PRSs were re-calibrated resulting in a 40m position loss.
What happened?
DGNSS#2 was under-weighted when DGNSS#1 was deselected – consequently the DP model relied on the flawed HPR positions.
Every time a PRS was recalibrated, it created a new origin for that reference, effectively walking the vessel away from the original set point. Original equipment manufacturer (OEM) operator manuals should be consulted as they hold a wealth of information which is often overlooked.
According to the OEM investigation report, water column conditions and reflections contributed to bad position data from the HPRs.
Conclusion
Shallow water environments pose specific challenges for hydroacoustic systems due to factors like multipath interference, reverberation, surface and bottom reflections, sound speed variability, ambient noise, and sedimentation. Addressing these issues requires a combination of advanced technology, adaptive strategies, and a thorough understanding of the local marine environment.
The choice of PRS (specifically hydroacoustic) was not suitable for 25m of water depth in this case. The crew should be aware that the reliability of HPR in such shallow water can be significantly degraded. The transducer head and the transponder head on the seafloor may also not have sufficient vertical separation. An alternative option may have been the use of Taut-wire. It is noted that the vessel was fitted with two lightweight Taut-wire systems.
Many DP event reports involving “PRS recalibration” have been sent to IMCA in the past. This is often one of the most misunderstood tasks a DPO can perform. No matter what type, the first PRS that the DP controller enables and accepts establishes the “reference origin” or the origin in the internal coordinate system. The “reference origin” is shown in relation to subsequent PRSs that are enabled. To recalibrate the “reference origin” all PRSs must be disabled, and the first PRS enabled will determine the new “reference origin”. In theory, every “recalibration of the reference origin” will result in a change in the vessel’s geographical position.
OEM operator manuals contain a wealth of information which will aid the operator. Further bridge exercises and drills are encouraged with an emphasis on loss or degraded PRSs. The ramifications of recalibrating the reference origin must be thoroughly understood.
Latest DP incidents
-
Complete the job
Whilst connected to a turbine, an alarm was generated on the DP operator station, ‘Unbalanced load on SWBD 1’.
DPE 01/25
16 January 2025
Undesired event
-
How is your alignment?
Loss of the CyScan position reference system generated a reference system failure alarm and moments later the vessel began to lose position with the accompanying alarms.
DPE 01/25
16 January 2025
Incident
-
Beware your centre of rotation
The stern thrusters started to oscillate which transferred to an oscillating motion of the vessel and high forces were being used to try to maintain position.
DPE 01/25
16 January 2025
Incident
-
A-Tension
Whilst pipelaying in shallow water, the vessel experienced a tension sensor failure on one tensioner.
DPE 01/25
16 January 2025
-
DP Drill Scenario
DP emergency drill scenarios are included to assist DP vessel management, DPOs / Engineers, and ETOs in conducting DP drills onboard.
DPE 01/25
16 January 2025
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.