Skip to content

Cooling pipe leak threatens main switchboard – DP observation

Comments:

A failure of a plug (old decommissioned cooling line for fridge compressors) on seawater cooling pipe for the Ac compressors resulted in flooding in the incinerator room (the water level was about 2cm depth) with small ingression of water in the engine control room on top of main 440V switchboard through a cable penetration.

The small water ingression (water dripping onto switchboard) was deflected by the design of the switchboard cover (class approved design) with a small quantity of water collecting on top. The quantity of water on top of the switchboard was so small that no immediate action was necessary to remove or control it during the incident. The top of the switchboard was dried after the leak was stopped and accumulated water had been removed from the incinerator room above.

Due to the desire to inspect inside the switchboard, with the vessel on standby but inside the .500m zone, the decision was taken to move outside the 500m zone as a precaution.

The vessel continued operations but remained outside the 500m.

Considerations from the above event:

  • The good practice of moving outside the 500m zone is noted.
  • Decommissioning of pipework by removal rather than plugging is the preferred method.
  • With only one motion reference unit (MRU) on line its failure would affect the stability of all position reference systems selected to the DP system.
  • Submission of DP observations, as learning opportunities, is much appreciated by members of the IMCA DP Focused Workgroup.

DP Event

Published: 29 March 2017
Download: IMCA DPE 01/17

Classification:
Submit a Report

The following case studies and observations have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity.

Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators and DP technical crew in appropriately determining how to safely conduct their own operations. Any queries should be directed to IMCA at [email protected]. Members and non-members alike are welcome to contact IMCA if they have experienced DP events which can be shared anonymously with the DP industry.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.