Inadequate shallow water lay-up reactivation procedures

Comments from the Report

The heat exchange system is poorly designed and without redundancy for half of the switchboard.  Design flaws were compounded by the introduction of turbidity and silt into the cooling system.  The vessel was idle for some time in shallow water and the systems were not adequately preserved.  There was biological fouling taking place on the heat exchangers.  Although multiple heat exchanger cleanings had occurred, the system was not adequately flushed to remove the fouling.

Considerations of the IMCA Marine DP Committee from the Above Event

  • The report indicates that although the cooling systems were cleaned prior to reactivation they had not been properly flushed and were therefore unable to perform to full capacity.
  • It is important that all redundant systems are able to perform to full capacity following loss of a redundant group. If not, there is a potential to exceed the WCFDI following a failure.
  • Performance tests should be part of the reactivation procedures after an idle period in shallow water.

DP Event

Published: 30 November 2018
Download: IMCA DPE 04/18

Classification:
Submit a Report

The following case studies and observations have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity.

Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators and DP technical crew in appropriately determining how to safely conduct their own operations. Any queries should be directed to IMCA at [email protected]. Members and non-members alike are welcome to contact IMCA if they have experienced DP events which can be shared anonymously with the DP industry.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.