Skip to content

Incorrect wiring causes loss of all propulsion

Comments:

Subsequent investigation identified the following:

  •  Through extensive evaluation by numerous technicians, the main cause of the incident was found to be the improper wiring of the main and backup power supplies. Three engines were electrically connected through the DC40 main power supply. This enabled an erroneous shut down signal to be sent to three engines simultaneously.
  • What were the causes of the incident? There was a fault in the wiring configuration of the vessel’s main engine 24VDC supply. The wiring for the main power supply and the backup power supply was reversed which tied the two main engines to the same main power supply, thereby reducing vessel redundancy. Furthermore, a ground fault was identified on the main 24V supply to the main engines. Subsequent testing revealed the diesel control units (DCU) responded differently when subjected to grounding tests; the port main engine would continue running while the starboard main engine would shut down.
  • What lessons were learnt? This misconfiguration, and subsequent loss of DP redundancy, was unknown to the crew. The wiring of the vessel’s main engine 24VDC supply had been completed prior to the current management company assuming management of the vessel. This incident further stresses the importance of a maintenance programme and complete maintenance records.

Actions:

Several changes were made to the vessel’s systems such as the replacement of the governor, DC40 battery supply and the starboard DCU and all was tested to satisfaction. To ensure the matter has been completely rectified, the vessel was subjected to a full five-year FMEA.

Considerations from the above event:

  • This incident stresses the importance for a good initial FMEA, the tracking of modifications and ensuring documentation is up to date, plus the importance of proving redundancy groups on a frequent basis.

DP Event

Published: 13 September 2016
Download: IMCA DPE 03/16

Classification:
Submit a Report

The following case studies and observations have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity.

Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators and DP technical crew in appropriately determining how to safely conduct their own operations. Any queries should be directed to IMCA at [email protected]. Members and non-members alike are welcome to contact IMCA if they have experienced DP events which can be shared anonymously with the DP industry.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.