Skip to content

Pipelaying equipment short circuit causes thrusters to trip – DP undesired event

Comments:

The vessel maintained position throughout.  The ROV was restricted to the tether management system (TMS) until the vessel was confident of the cause of the thrusters’ unexpectedly stopping.

All damaged sections of the ‘lay spread’ DC bus bars which fed in to the spare drive section of frame A were removed from service and all cabinets cleaned and dried out with air driers.  Blown fuses were replaced; the vessel was confident that the fault was localised to the bus bar, and not the connected equipment.  The set point of the air conditioning unit was adjusted from 21°C up to 28°C and signage placed on the AC units stating ‘Not to be adjusted’.  All external doors have been closed and signage placed on the doors stating ‘To be kept closed at all times’.

Considerations from the above event:

  • The DP system was configured for open bus tie operation;
  • Pipelaying (project) equipment should be on a separate switchboard to critical DP auxiliary equipment;
  • Ideally, main and standby equipment should be fed from separate switchboards;
  • Four DGNSS were online – this is contrary to International Maritime Organization (IMO) DP equipment class 2 requirements of requiring three position reference systems of which at least two should operate on different principles.

DP Event

Published: 29 November 2016
Download: IMCA DPE 04/16

Classification:
Submit a Report

The following case studies and observations have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity.

Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators and DP technical crew in appropriately determining how to safely conduct their own operations. Any queries should be directed to IMCA at [email protected]. Members and non-members alike are welcome to contact IMCA if they have experienced DP events which can be shared anonymously with the DP industry.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.