Alteration of course with COR offset causes loss of power
- DP Event
- Published on 29 November 2016
- Generated on 9 May 2025
- DPE 04/16
- 2 minute read
Incident
Jump to:
Investigation as to why the emergency generator did not connect to the bus bar, and therefore aid blackout recovery, was ongoing.

Comments
The report discussed the set-up and mode selection for the thrusters and main engines during high power manoeuvres such as alteration of course and heading. The vessel standing orders were changed accordingly.
Investigation as to why the emergency generator did not connect to the bus bar and therefore aid blackout recovery was ongoing.
Considerations
- The DPO should be aware of the vessel’s DP capability taking into account the environmental conditions and in this case the additional thrust required by the centre of rotation (COR) being set at the lay chute.
- It was not clear whether the rate of turn could have been adjusted to reduce thruster demand. Considering the COR was set at the stern, it should have been set at a low rate.
- Was the power management system set up correctly as it should have reduced power demand by activating non-essential tripping as part of black out prevention?
- It should be questioned whether stopping thruster No 2 contributed to the incident as it may have been reacting as required.
- What was the problem with the set-up of the emergency generator, was it available for manual start only?
- Stresses the importance of the technical crew being adequately trained to deal with a black-out event.
Latest DP incidents
-
Complete the job
Whilst connected to a turbine, an alarm was generated on the DP operator station, ‘Unbalanced load on SWBD 1’.
DPE 01/25
16 January 2025
Undesired event
-
Beware your centre of rotation
The stern thrusters started to oscillate which transferred to an oscillating motion of the vessel and high forces were being used to try to maintain position.
DPE 01/25
16 January 2025
Incident
-
A-Tension
Whilst pipelaying in shallow water, the vessel experienced a tension sensor failure on one tensioner.
DPE 01/25
16 January 2025
-
How is your alignment?
Loss of the CyScan position reference system generated a reference system failure alarm and moments later the vessel began to lose position with the accompanying alarms.
DPE 01/25
16 January 2025
Incident
-
DP Drill Scenario
DP emergency drill scenarios are included to assist DP vessel management, DPOs / Engineers, and ETOs in conducting DP drills onboard.
DPE 01/25
16 January 2025
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.