Alteration of course with COR offset causes loss of power
- DP Event
- Published on 29 November 2016
- Generated on 21 September 2026
- DPE 04/16
- 2 minute read
Incident
Jump to:
Investigation as to why the emergency generator did not connect to the bus bar, and therefore aid blackout recovery, was ongoing.
Comments
The report discussed the set-up and mode selection for the thrusters and main engines during high power manoeuvres such as alteration of course and heading. The vessel standing orders were changed accordingly.
Investigation as to why the emergency generator did not connect to the bus bar and therefore aid blackout recovery was ongoing.
Considerations
- The DPO should be aware of the vessel’s DP capability taking into account the environmental conditions and in this case the additional thrust required by the centre of rotation (COR) being set at the lay chute.
- It was not clear whether the rate of turn could have been adjusted to reduce thruster demand. Considering the COR was set at the stern, it should have been set at a low rate.
- Was the power management system set up correctly as it should have reduced power demand by activating non-essential tripping as part of black out prevention?
- It should be questioned whether stopping thruster No 2 contributed to the incident as it may have been reacting as required.
- What was the problem with the set-up of the emergency generator, was it available for manual start only?
- Stresses the importance of the technical crew being adequately trained to deal with a black-out event.
Latest DP incidents
-
Know your equipment, or at least where to find the answers
During an update in the Follow Target Mode, the crew noticed an anomaly with joystick control.
DPE 02/26
1 September 2026
Observation
-
New equipment, unexpected consequences
During the operation, a loss of DGNSS correction signals was experienced across multiple vessel DGNSS units.
DPE 02/26
1 September 2026
Incident
-
A chain of small failures leads to a major consequence
While conducting cargo operations on DP a vessel experienced a partial blackout caused by an unexpected shutdown of generator 3
DPE 02/26
1 September 2026
Incident
-
Holding position, losing references
While approaching a turret-moored, weather-vaning offshore installation (FPSO), in preparation for cargo operations, a DP equipment class 2 vessel experienced significant rolling of up to 15–20° due to a long-period swell close to the vessel’s natural roll period, resulting in a resonance effect
DPE 02/26
1 September 2026
Observation
-
DP drill scenario – Loss of seawater cooling pump redundancy
Exercise scenario – Loss of seawater cooling pump redundancy
DPE 02/26
1 September 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.