Alteration of course with COR offset causes loss of power
- DP Event
- Published on 29 November 2016
- Generated on 5 November 2026
- DPE 04/16
- 2 minute read
Incident
Jump to:
Investigation as to why the emergency generator did not connect to the bus bar, and therefore aid blackout recovery, was ongoing.
Comments
The report discussed the set-up and mode selection for the thrusters and main engines during high power manoeuvres such as alteration of course and heading. The vessel standing orders were changed accordingly.
Investigation as to why the emergency generator did not connect to the bus bar and therefore aid blackout recovery was ongoing.
Considerations
- The DPO should be aware of the vessel’s DP capability taking into account the environmental conditions and in this case the additional thrust required by the centre of rotation (COR) being set at the lay chute.
- It was not clear whether the rate of turn could have been adjusted to reduce thruster demand. Considering the COR was set at the stern, it should have been set at a low rate.
- Was the power management system set up correctly as it should have reduced power demand by activating non-essential tripping as part of black out prevention?
- It should be questioned whether stopping thruster No 2 contributed to the incident as it may have been reacting as required.
- What was the problem with the set-up of the emergency generator, was it available for manual start only?
- Stresses the importance of the technical crew being adequately trained to deal with a black-out event.
Latest DP incidents
-
Watch what you are pressing
While transiting away from a wind farm, the Master of a DP equipment class 2 vessel observed that the vessel was operating in Backup Mode and queried this with the bridge team and attending electrician
DPE 03/26
19 October 2026
Incident
-
The domino effect
The event demonstrates the importance of maintaining the approved DP power configuration, addressing known defects before equipment is relied upon during DP operations, and ensuring DP personnel understand how changes to the generating arrangement can affect redundancy and failure propagation
DPE 03/26
19 October 2026
Incident
-
Lost in calibration
During activity associated with calibration of a vessel Vertical Reference Unit (VRU), the DP control system experienced degradation of its attitude reference arrangement. Shortly afterwards, the vessel generated an Off Position Warning followed by an Off Position Alarm
DPE 03/26
19 October 2026
Incident
-
The UPS and downs
While a vessel was transiting in DP mode, the DPO observed the loss of Gyros 2 and 3 together with alarms from a 230V backup power supply. The telephone system remained powered but was inoperable.
DPE 03/26
19 October 2026
Incident
-
DP drill scenario – Consequence Analysis Class DP2 & DP3
DP drill scenario – Consequence Analysis Class DP2 & DP3
DPE 03/26
19 October 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.