Both DP operating stations stopped communication
- DP Event
- Published on 10 August 2017
- Generated on 22 December 2025
- DPE 03/17
- 2 minute read
Incident
Jump to:
The report suggests the possibility that the vessel returned to operations without sufficient testing to find the root cause of the problem.
Comments
- It is possible that as the vessel was only recently set up on DP, field arrival trials had not yet been completed.
- The use of DGNSS as the only position reference system for DP equipment class 2 operations is not good practice, however it is recognised that deployment of the CTD beacon could be in preparation for initiating a DP acoustic system.
- It is not clear, from the information provided, of the exact sequence of events: sensors and position reference systems are hard wired to the DP controller or Fieldnet connections, located in the DP controller cabinet, they are not connected directly to the DP OS and therefore position keeping capability should not have been affected by the OS not communicating.
- One possibility is that it was the DP controllers that stopped communicating and caused the problem; if this was the case the question should have been asked how this single point failure could have happened.
- The vessel would probably be controlled better using the independent joystick rather than individual manual control of the thrusters.
- The report suggests the possibility that the vessel returned to operations without sufficient testing to find the root cause of the problem.
Latest DP incidents
-
Simultaneous Operations
A DP Incident report highlighting the importance of maintaining focus during time on the DP desk
DPE 03/25
18 December 2025
Incident
-
DP drill scenario
DP emergency drill scenarios are included to assist DP vessel management and DPOs / Engineers and ETOs to conduct DP drills onboard.
DPE 03/25
18 December 2025
Drill Scenario
-
Know your settings
This Dynamic Positioning (DP) incident involved a DP equipment class 2 offshore supply vessel (OSV) during loadout operations from a drilling rig.
DPE 03/25
18 December 2025
Incident
-
Importance of familiarisation and paying attention
The importance of maintaining full attention during the operator's time on the DP desk can never be underestimated, or forgotten
DPE 03/25
18 December 2025
Incident
-
Worst case failure preparedness
Operators must be prepared for worst case failures
DPE 03/25
18 December 2025
Incident
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.