Both DP operating stations stopped communication
- DP Event
- Published on 10 August 2017
- Generated on 23 June 2026
- DPE 03/17
- 2 minute read
Incident
Jump to:
The report suggests the possibility that the vessel returned to operations without sufficient testing to find the root cause of the problem.
Comments
- It is possible that as the vessel was only recently set up on DP, field arrival trials had not yet been completed.
- The use of DGNSS as the only position reference system for DP equipment class 2 operations is not good practice, however it is recognised that deployment of the CTD beacon could be in preparation for initiating a DP acoustic system.
- It is not clear, from the information provided, of the exact sequence of events: sensors and position reference systems are hard wired to the DP controller or Fieldnet connections, located in the DP controller cabinet, they are not connected directly to the DP OS and therefore position keeping capability should not have been affected by the OS not communicating.
- One possibility is that it was the DP controllers that stopped communicating and caused the problem; if this was the case the question should have been asked how this single point failure could have happened.
- The vessel would probably be controlled better using the independent joystick rather than individual manual control of the thrusters.
- The report suggests the possibility that the vessel returned to operations without sufficient testing to find the root cause of the problem.
Latest DP incidents
-
Think twice. Press once!
On a DP equipment class 2 supply vessel engaged in drilling, an incident occurred due to lack of operational knowledge
DPE 01/26
11 May 2026
Incident
-
Network issues, not a thing of the past
A DP equipment class 3 vessel was engaged in saturation diving activities, with two divers in the water when this DP incident occurred.
DPE 01/26
11 May 2026
Incident
-
All swept up
A DP equipment class 2 vessel was engaged in rock placement operations, within close proximity to a structure, when this event occurred.
DPE 01/26
11 May 2026
Undesired event
-
Hybrid system won't accept load
A DP equipment class 2 vessel was engaged in operations whilst holding position on auto DP, when this undesired event occurred
DPE 01/26
11 May 2026
Undesired event
-
DP drill scenario – Loss of main DP system UPS
The objective of this scenario is to identify risks and impacts of losing the main DP system uninterruptible power supply, possibilities to reduce that risk and suitable actions to be taken if such an occurrence happened.
DPE 01/26
11 May 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.