Change of heading leads to DP incident
- DP Event
- Published on 25 February 2020
- Generated on 9 May 2025
- DPE 01/20
- 2 minute read
Incident
Jump to:
Further investigation revealed the overspeed settings were too tight and had to be increased in accordance with manufacturer’s recommendation.

Comments
The vessel had been on DP for the whole day and in order to lift the ROV on deck with the crane, vessel heading had to be changed 15 degrees away from the wind.
This caused a high load on two running bow thrusters and the third bow thruster was started, selected to DP and successfully shared the load. Increased windward force on the vessel due to high wind velocity acting on it as it changed heading, caused all the three bow thrusters to trip on overspeed with no DP or thrusters’ control system alarms.
Further investigation revealed the overspeed settings were too tight and had to be increased in accordance with manufacturer’s recommendation.
Considerations
- It is not clear why the additional bow thruster was not put online before the heading change.
- A simulated alteration of heading and or referring to the vessel’s capability plots should have been considered to ensure that the heading change could have been performed within vessel’s DP capability.
- The overspeed trip of all thrusters during DP operations shows inadequate initial commissioning and full power testing during the FMEA proving trials and annual DP trials and following any modification.
- This incident further highlights the importance of equipment protection settings with respect to DP redundancy concept, in addition to equipment safety. DP FMEAs require to consider the effects of equipment protection system on the wider DP redundancy concept.
- Reference: Guidance on Failure Modes & Effects Analysis (FMEA) (IMCA M166).
Latest DP incidents
-
Complete the job
Whilst connected to a turbine, an alarm was generated on the DP operator station, ‘Unbalanced load on SWBD 1’.
DPE 01/25
16 January 2025
Undesired event
-
Beware your centre of rotation
The stern thrusters started to oscillate which transferred to an oscillating motion of the vessel and high forces were being used to try to maintain position.
DPE 01/25
16 January 2025
Incident
-
A-Tension
Whilst pipelaying in shallow water, the vessel experienced a tension sensor failure on one tensioner.
DPE 01/25
16 January 2025
-
How is your alignment?
Loss of the CyScan position reference system generated a reference system failure alarm and moments later the vessel began to lose position with the accompanying alarms.
DPE 01/25
16 January 2025
Incident
-
DP Drill Scenario
DP emergency drill scenarios are included to assist DP vessel management, DPOs / Engineers, and ETOs in conducting DP drills onboard.
DPE 01/25
16 January 2025
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.