Change of heading leads to DP incident
- DP Event
- Published on 25 February 2020
- Generated on 12 November 2026
- DPE 01/20
- 2 minute read
Incident
Jump to:
Further investigation revealed the overspeed settings were too tight and had to be increased in accordance with manufacturer’s recommendation.
Comments
The vessel had been on DP for the whole day and in order to lift the ROV on deck with the crane, vessel heading had to be changed 15 degrees away from the wind.
This caused a high load on two running bow thrusters and the third bow thruster was started, selected to DP and successfully shared the load. Increased windward force on the vessel due to high wind velocity acting on it as it changed heading, caused all the three bow thrusters to trip on overspeed with no DP or thrusters’ control system alarms.
Further investigation revealed the overspeed settings were too tight and had to be increased in accordance with manufacturer’s recommendation.
Considerations
- It is not clear why the additional bow thruster was not put online before the heading change.
- A simulated alteration of heading and or referring to the vessel’s capability plots should have been considered to ensure that the heading change could have been performed within vessel’s DP capability.
- The overspeed trip of all thrusters during DP operations shows inadequate initial commissioning and full power testing during the FMEA proving trials and annual DP trials and following any modification.
- This incident further highlights the importance of equipment protection settings with respect to DP redundancy concept, in addition to equipment safety. DP FMEAs require to consider the effects of equipment protection system on the wider DP redundancy concept.
- Reference: Guidance on Failure Modes & Effects Analysis (FMEA) (IMCA M166).
Latest DP incidents
-
Watch what you are pressing
While transiting away from a wind farm, the Master of a DP equipment class 2 vessel observed that the vessel was operating in Backup Mode and queried this with the bridge team and attending electrician
DPE 03/26
19 October 2026
Incident
-
The domino effect
The event demonstrates the importance of maintaining the approved DP power configuration, addressing known defects before equipment is relied upon during DP operations, and ensuring DP personnel understand how changes to the generating arrangement can affect redundancy and failure propagation
DPE 03/26
19 October 2026
Incident
-
Lost in calibration
During activity associated with calibration of a vessel Vertical Reference Unit (VRU), the DP control system experienced degradation of its attitude reference arrangement. Shortly afterwards, the vessel generated an Off Position Warning followed by an Off Position Alarm
DPE 03/26
19 October 2026
Incident
-
The UPS and downs
While a vessel was transiting in DP mode, the DPO observed the loss of Gyros 2 and 3 together with alarms from a 230V backup power supply. The telephone system remained powered but was inoperable.
DPE 03/26
19 October 2026
Incident
-
DP drill scenario – Consequence Analysis Class DP2 & DP3
DP drill scenario – Consequence Analysis Class DP2 & DP3
DPE 03/26
19 October 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.