DP event investigation and testing inside the 500m zone
- DP Event
- Published on 29 March 2017
- Generated on 26 September 2026
- DPE 01/17
- 1 minute read
Incident
Jump to:
The vessel should have proceeded out of the 500m zone to a safe area prior to investigating the fault and conducting tests.
Comments
The report concluded that the vessel should have proceeded out of the 500m zone to a safe area prior to investigating the fault and conducting tests.
Considerations
- There is no doubt that in circumstances such as this, where investigation and testing is required following a DP event, it should be conducted in a safe location and as a minimum outside the 500m zone.
- The DP system’s level of redundancy always needs to be considered during investigation and testing.
- It is not evident from the report, but it is wondered whether complacency contributed to this bad practice.
- The original reported DP alarm should have resulted in a DP yellow alert.
- The vessel might have considered using the independent joystick (IJS) rather than individual levers.
- Emergency handling of the vessel should be practised on a regular basis.
Latest DP incidents
-
Know your equipment, or at least where to find the answers
During an update in the Follow Target Mode, the crew noticed an anomaly with joystick control.
DPE 02/26
1 September 2026
Observation
-
New equipment, unexpected consequences
During the operation, a loss of DGNSS correction signals was experienced across multiple vessel DGNSS units.
DPE 02/26
1 September 2026
Incident
-
A chain of small failures leads to a major consequence
While conducting cargo operations on DP a vessel experienced a partial blackout caused by an unexpected shutdown of generator 3
DPE 02/26
1 September 2026
Incident
-
Holding position, losing references
While approaching a turret-moored, weather-vaning offshore installation (FPSO), in preparation for cargo operations, a DP equipment class 2 vessel experienced significant rolling of up to 15–20° due to a long-period swell close to the vessel’s natural roll period, resulting in a resonance effect
DPE 02/26
1 September 2026
Observation
-
DP drill scenario – Loss of seawater cooling pump redundancy
Exercise scenario – Loss of seawater cooling pump redundancy
DPE 02/26
1 September 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.