Isolation of backup supplies to DP critical equipment
- DP Event
- Published on 30 November 2018
- Generated on 14 December 2024
- DPE 04/18
- 3 minute read
Undesired event
Jump to:
A DP 2 vessel was engaged in open water ROV operations with both ROVs and cranes in the water.
Overview
A DP 2 vessel was engaged in open water ROV operations with both ROVs and cranes in the water – the hook recovery was ongoing. The vessel was set up according to its critical activity mode (CAM) and, at the request of the end client, all identified cross connections were to be isolated. This included numerous backup supplies to a range of DP critical equipment. The vessel was being operated with two redundant groups.
What happened?
The vessel suffered a partial loss of power from the port switchboard. This resulted in the loss of one redundant thruster group, one ROV and the main crane. The vessel maintained position post failure, allowing immediate investigations to take place in a controlled manor.
Investigation
The ship’s uninterruptible power supply (UPS) (for the failed redundant group) main supply change over switch was found in the ‘emergency’ position instead of the ‘main’ position.
As a result of the isolation of backup supplies, the UPS batteries had effectively discharged, and supplies failed thereafter causing the DP event.
The UPS switch was selected to ‘main’, which repowered the UPS to allow reinstatement of the redundant thruster group and mission related consumers.
Further investigation revealed that the position of the UPS supply switch was not part of the DP system setup checklist, nor was it highlighted as a critical setting within the CAM configuration.
Lessons learned
- Any modification to a worse-case failure design Intent (WCFDI) configuration (which has been proved through the DP failure modes and effects analysis process (FMEA)) must be managed under a robust management of change (MoC) process with appropriate checks identified and undertaken. When clients are requesting particular operating modes of vessels, then the MoC process needs to also consider the DP FMEA and all associated operational criteria.
- A periodic review of the completeness of operational checklists prior to and during DP operations to ensure that the vessel is operating as designed is essential.
- In conjunction with the lesson above, it is vital that all equipment that has a selection choice is correctly labelled to clearly identify the selection and to avoid unnecessary confusion.
- The actions of the crew coupled with the robust redundancy concept meant that the vessel operated as expected post event and during the immediate investigations thereafter.
Conclusion
This case study demonstrates the importance of robust consideration of requested mode changes that deviate from the vessels’ failure analysis. It further highlights the importance of robust MoC procedures to understand the effects of the change on the equipment and/or redundancy concept.
Latest DP incidents
-
Prepare for 2025 solar activity
This case study covers events that occurred on the same vessel, eight months apart.
DPE 02/24
29 July 2024
Undesired event
-
Know your vessel capabilities and when to stop!
An incident that occurred on an equipment class 2 MODU, during well intervention operations.
DPE 02/24
29 July 2024
Incident
-
Duty/not duty, which is the question?
With no steering control of the port azimuth thruster, and no other thrusters operational, the heading of the FPU could not be maintained.
DPE 02/24
29 July 2024
Undesired event
-
You’ve got the ASOG, so now you’ve got to follow it
This case study examines an incident that occurred on an equipment class 2 MODU, during well intervention operations.
DPE 02/24
29 July 2024
Incident
-
Button trouble
A Dynamically Positioned vessel experienced a loss of Dynamic Positioning (DP) control while installing cable within a wind farm.
DPE 01/24
3 April 2024
Incident
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.