Loss of one redundant group
- DP Event
- Published on 18 February 2019
- Generated on 23 October 2026
- DPE 01/19
- 2 minute read
Undesired event
Jump to:
The power management system worked as expected, investigation found a poor connection to the temperature sensor causing fluctuations.
Comments
A partial blackout of the centre high voltage (HV) switchboard at 11.04am caused by No.2 generator. This caused the loss of the 440V distribution board and thrusters No. 3 and 6. The centre generator No.1 started and connected onto the switchboard, there was no loss of power to the drill floor as this is fed from both port and starboard HV switchboards.
The power management system worked as expected, investigation found a poor connection to the temperature sensor of No.2 generator causing the temperature fluctuation.
There was no loss of position.
Considerations
- With the loss of one redundant group DP amber alert should have been activated.
- The system reacted well to the loss of the centre switchboard however it was felt worthwhile to highlight the configuration in this case. The vessel was operating with one generator on each of the three switchboards. Therefore, it was accepted that if one generator failed then one redundant group would be lost.
- It is important that DP personnel are fully aware of the situation and recognise that there could be a degree of risk as the switchboard is brought back on line.
Latest DP incidents
-
The domino effect
The event demonstrates the importance of maintaining the approved DP power configuration, addressing known defects before equipment is relied upon during DP operations, and ensuring DP personnel understand how changes to the generating arrangement can affect redundancy and failure propagation
DPE 03/26
19 October 2026
Incident
-
Lost in calibration
During activity associated with calibration of a vessel Vertical Reference Unit (VRU), the DP control system experienced degradation of its attitude reference arrangement. Shortly afterwards, the vessel generated an Off Position Warning followed by an Off Position Alarm
DPE 03/26
19 October 2026
Incident
-
Watch what you are pressing
While transiting away from a wind farm, the Master of a DP equipment class 2 vessel observed that the vessel was operating in Backup Mode and queried this with the bridge team and attending electrician
DPE 03/26
19 October 2026
Incident
-
DP drill scenario – Consequence Analysis Class DP2 & DP3
DP drill scenario – Consequence Analysis Class DP2 & DP3
DPE 03/26
19 October 2026
Drill Scenario
-
The UPS and downs
While a vessel was transiting in DP mode, the DPO observed the loss of Gyros 2 and 3 together with alarms from a 230V backup power supply. The telephone system remained powered but was inoperable.
DPE 03/26
19 October 2026
Incident
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.