Loss of one redundant group
- DP Event
- Published on 18 February 2019
- Generated on 13 June 2026
- DPE 01/19
- 2 minute read
Undesired event
Jump to:
The power management system worked as expected, investigation found a poor connection to the temperature sensor causing fluctuations.
Comments
A partial blackout of the centre high voltage (HV) switchboard at 11.04am caused by No.2 generator. This caused the loss of the 440V distribution board and thrusters No. 3 and 6. The centre generator No.1 started and connected onto the switchboard, there was no loss of power to the drill floor as this is fed from both port and starboard HV switchboards.
The power management system worked as expected, investigation found a poor connection to the temperature sensor of No.2 generator causing the temperature fluctuation.
There was no loss of position.
Considerations
- With the loss of one redundant group DP amber alert should have been activated.
- The system reacted well to the loss of the centre switchboard however it was felt worthwhile to highlight the configuration in this case. The vessel was operating with one generator on each of the three switchboards. Therefore, it was accepted that if one generator failed then one redundant group would be lost.
- It is important that DP personnel are fully aware of the situation and recognise that there could be a degree of risk as the switchboard is brought back on line.
Latest DP incidents
-
Think twice. Press once!
On a DP equipment class 2 supply vessel engaged in drilling, an incident occurred due to lack of operational knowledge
DPE 01/26
11 May 2026
Incident
-
Network issues, not a thing of the past
A DP equipment class 3 vessel was engaged in saturation diving activities, with two divers in the water when this DP incident occurred.
DPE 01/26
11 May 2026
Incident
-
All swept up
A DP equipment class 2 vessel was engaged in rock placement operations, within close proximity to a structure, when this event occurred.
DPE 01/26
11 May 2026
Undesired event
-
Hybrid system won't accept load
A DP equipment class 2 vessel was engaged in operations whilst holding position on auto DP, when this undesired event occurred
DPE 01/26
11 May 2026
Undesired event
-
DP drill scenario – Loss of main DP system UPS
The objective of this scenario is to identify risks and impacts of losing the main DP system uninterruptible power supply, possibilities to reduce that risk and suitable actions to be taken if such an occurrence happened.
DPE 01/26
11 May 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.