Loss of three gyros on a DP3 drillship
- DP Event
- Published on 2 December 2014
- Generated on 13 December 2024
- DPE 01/14
- 3 minute read
Incident
Jump to:
Three DP System connected gyros heading froze within five minutes of time. With all three gyros out of service, drillship’s DP Model took over.
What happened?
Three DP System connected gyros heading froze within five minutes of time. With all three gyros out of service, drillship’s DP Model took over. 34 minutes later all gyros had been rebooted and were online in the DP System. Gyros were of modern fibre optic style.
The max excursion of vessel position was 20 meters over 34 minutes. Calm weather was benign enough to allow accurate model control of drilling vessel for duration of 34 minutes. Drillship was connected to well head while tripping into hole when incident occurred but emergency disconnect was not required.
What went wrong?
The investigation is ongoing which will require analysis of all three gyros in a laboratory by original manufacturer. Nothing can be stated conclusively until root cause analysis and investigation is complete. Drillship had been in service less than a year at the time of the incident.
What were the causes of the incident?
As of the writing of this safety flash, the proximate cause is unknown. Initial review reveals observations that may or may not have contributed to this incident, in whole or part and is not intended to reflect negatively upon any vendor or operators approach to construction/design:
- Commonality of three identical make and model gyros with common software, firmware, and hardware.
- Common backup 24 volt power source among three gyros could have allowed voltage instability to affect all three gyros at the same moment in time.
- Out of date firmware existed on three gyros.
- Automatic feed of GPS inputs existed.
- Manufacturer’s technical bulletins existed but it remains unclear if that is relevant.
- Simultaneous initial power-up start time of internal gyro clocks in shipyard possible.
- Unknown age of gyros installed in shipyard.
What lessons were learnt?
- An active, approved & well-rehearsed Well Specific Operating Guideline (WSOG) contributed to the safe reaction of on-board staff.
- Calm weather contributed to the effectiveness of the DP Model.
- Open and clear communications are crucial to successful response and resolution.
- Common mode faults should be interrupted thru use of different brands, different power connections, and thoroughly tested during a Failure Mode Effect and Analysis (FMEA) conducted by an independent third party.
- Concerns identified during FMEA testing should be followed up by management and risk assessed according to IMCA/industry.
Actions
Deep root cause analysis is to be conducted and a step change to installed equipment is ongoing.
Latest DP incidents
-
Prepare for 2025 solar activity
This case study covers events that occurred on the same vessel, eight months apart.
DPE 02/24
29 July 2024
Undesired event
-
Know your vessel capabilities and when to stop!
An incident that occurred on an equipment class 2 MODU, during well intervention operations.
DPE 02/24
29 July 2024
Incident
-
Duty/not duty, which is the question?
With no steering control of the port azimuth thruster, and no other thrusters operational, the heading of the FPU could not be maintained.
DPE 02/24
29 July 2024
Undesired event
-
You’ve got the ASOG, so now you’ve got to follow it
This case study examines an incident that occurred on an equipment class 2 MODU, during well intervention operations.
DPE 02/24
29 July 2024
Incident
-
Button trouble
A Dynamically Positioned vessel experienced a loss of Dynamic Positioning (DP) control while installing cable within a wind farm.
DPE 01/24
3 April 2024
Incident
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.