Voltage instability was caused by a spike load on an unrelated circuit breaker on the switchboard which tripped the thruster hydraulic pump.
Comments
During diving operations in open water, tunnel thruster No.1 tripped offline.
Investigation showed that the cause was due to tripping of the thruster hydraulic pump because of voltage instability. The voltage instability was caused by a spike load on an unrelated circuit breaker on the same switchboard which tripped. Because of the voltage drop on starboard 690V switchboard during the event some of the equipment breakers opened on under voltage:
- Tunnel Thruster No.1 due to power drop to hydraulic pump and signal command “External Shutdown” from controller to frequency converter drive.
- Starboard ER fans.
The vessel maintained position throughout the event.
Considerations
- This event highlights how unrelated equipment failure can have an effect on DP system equipment and therefore the vessels redundancy concept and needs to be considered during failure analysis.
- It is assumed that redundancy was not compromised by the tripping of the tunnel thruster and therefore it was not necessary to initiate a DP amber alert.
- It is not good practice to have four DGNSS selected to the DP controller, this could result in rejecting other selected systems if the DGNSS were to drift due to a common satellite problem.
- The root cause should have been identified and isolated from the 690v switchboard before the thruster was re-enabled.
Latest DP incidents
-
Prepare for 2025 solar activity
This case study covers events that occurred on the same vessel, eight months apart.
DPE 02/24
29 July 2024
Undesired event
-
Know your vessel capabilities and when to stop!
An incident that occurred on an equipment class 2 MODU, during well intervention operations.
DPE 02/24
29 July 2024
Incident
-
Duty/not duty, which is the question?
With no steering control of the port azimuth thruster, and no other thrusters operational, the heading of the FPU could not be maintained.
DPE 02/24
29 July 2024
Undesired event
-
You’ve got the ASOG, so now you’ve got to follow it
This case study examines an incident that occurred on an equipment class 2 MODU, during well intervention operations.
DPE 02/24
29 July 2024
Incident
-
Button trouble
A Dynamically Positioned vessel experienced a loss of Dynamic Positioning (DP) control while installing cable within a wind farm.
DPE 01/24
3 April 2024
Incident
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.