Loss of tunnel thruster
- DP Event
- Published on 18 February 2019
- Generated on 13 May 2026
- DPE 01/19
- 2 minute read
Undesired event
Jump to:
Voltage instability was caused by a spike load on an unrelated circuit breaker on the switchboard which tripped the thruster hydraulic pump.
Comments
During diving operations in open water, tunnel thruster No.1 tripped offline.
Investigation showed that the cause was due to tripping of the thruster hydraulic pump because of voltage instability. The voltage instability was caused by a spike load on an unrelated circuit breaker on the same switchboard which tripped. Because of the voltage drop on starboard 690V switchboard during the event some of the equipment breakers opened on under voltage:
- Tunnel Thruster No.1 due to power drop to hydraulic pump and signal command “External Shutdown” from controller to frequency converter drive.
- Starboard ER fans.
The vessel maintained position throughout the event.
Considerations
- This event highlights how unrelated equipment failure can have an effect on DP system equipment and therefore the vessels redundancy concept and needs to be considered during failure analysis.
- It is assumed that redundancy was not compromised by the tripping of the tunnel thruster and therefore it was not necessary to initiate a DP amber alert.
- It is not good practice to have four DGNSS selected to the DP controller, this could result in rejecting other selected systems if the DGNSS were to drift due to a common satellite problem.
- The root cause should have been identified and isolated from the 690v switchboard before the thruster was re-enabled.
Latest DP incidents
-
Hybrid system won't accept load
A DP equipment class 2 vessel was engaged in operations whilst holding position on auto DP, when this undesired event occurred
DPE 01/26
11 May 2026
Undesired event
-
All swept up
A DP equipment class 2 vessel was engaged in rock placement operations, within close proximity to a structure, when this event occurred.
DPE 01/26
11 May 2026
Undesired event
-
Network issues, not a thing of the past
A DP equipment class 3 vessel was engaged in saturation diving activities, with two divers in the water when this DP incident occurred.
DPE 01/26
11 May 2026
Incident
-
Think twice. Press once!
On a DP equipment class 2 supply vessel engaged in drilling, an incident occurred due to lack of operational knowledge
DPE 01/26
11 May 2026
Incident
-
DP drill scenario – Loss of main DP system UPS
The objective of this scenario is to identify risks and impacts of losing the main DP system uninterruptible power supply, possibilities to reduce that risk and suitable actions to be taken if such an occurrence happened.
DPE 01/26
11 May 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.