The lift had not been properly planned for the object being lifted – there was a failure to recognise that the mattress was not a routine lift.
Comments
The vessel maintained position throughout. The lift had not been properly planned or risk assessed for the object being lifted. There was a failure to recognise that the mattress was not a routine lift. A generic lift plan was used which did not cover this specific lift.
Considerations
- Danger of recognising an operation as routine, when it isn’t, and therefore using inappropriate standard procedures and risk assessments.
- A situational awareness of the whole operation, involving all departments, is required.
- Was there pressure to perform the task on an inappropriate vessel heading?
- One thruster was on standby – if the lift had been identified as non-standard then possibly all thrusters would have been online.
- DP red alert was used by the DP operator (DPO), although redundancy had not been compromised. It is unknown whether this was in line with the activity specific operating guidelines (ASOG), however the DPO considered that the event had potential to escalate and therefore decided to initiate red alert.
Latest DP incidents
-
The domino effect
The event demonstrates the importance of maintaining the approved DP power configuration, addressing known defects before equipment is relied upon during DP operations, and ensuring DP personnel understand how changes to the generating arrangement can affect redundancy and failure propagation
DPE 03/26
19 October 2026
Incident
-
Lost in calibration
During activity associated with calibration of a vessel Vertical Reference Unit (VRU), the DP control system experienced degradation of its attitude reference arrangement. Shortly afterwards, the vessel generated an Off Position Warning followed by an Off Position Alarm
DPE 03/26
19 October 2026
Incident
-
Watch what you are pressing
While transiting away from a wind farm, the Master of a DP equipment class 2 vessel observed that the vessel was operating in Backup Mode and queried this with the bridge team and attending electrician
DPE 03/26
19 October 2026
Incident
-
DP drill scenario – Consequence Analysis Class DP2 & DP3
DP drill scenario – Consequence Analysis Class DP2 & DP3
DPE 03/26
19 October 2026
Drill Scenario
-
The UPS and downs
While a vessel was transiting in DP mode, the DPO observed the loss of Gyros 2 and 3 together with alarms from a 230V backup power supply. The telephone system remained powered but was inoperable.
DPE 03/26
19 October 2026
Incident
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.