Non-routine lift leads to thruster incapacity
- DP Event
- Published on 29 November 2016
- Generated on 24 March 2025
- DPE 04/16
- 1 minute read
Undesired event
Jump to:
The lift had not been properly planned for the object being lifted – there was a failure to recognise that the mattress was not a routine lift.

Comments
The vessel maintained position throughout. The lift had not been properly planned or risk assessed for the object being lifted. There was a failure to recognise that the mattress was not a routine lift. A generic lift plan was used which did not cover this specific lift.
Considerations
- Danger of recognising an operation as routine, when it isn’t, and therefore using inappropriate standard procedures and risk assessments.
- A situational awareness of the whole operation, involving all departments, is required.
- Was there pressure to perform the task on an inappropriate vessel heading?
- One thruster was on standby – if the lift had been identified as non-standard then possibly all thrusters would have been online.
- DP red alert was used by the DP operator (DPO), although redundancy had not been compromised. It is unknown whether this was in line with the activity specific operating guidelines (ASOG), however the DPO considered that the event had potential to escalate and therefore decided to initiate red alert.
Latest DP incidents
-
Thorough preparation is key
With 4 of 8 diesel generators running and connected to a closed ring bus, and 7 of the 8 thrusters selected to DP, a DP equipment class 3 MODU was set up in Green mode whilst on standby.
DPE 03/24
5 November 2024
Incident
-
There – but not really there
This DP event occurred on a DP equipment class two supply vessel whilst carrying out cargo operations on the starboard side alongside the asset and working at the lee side in the drift-off position.
DPE 03/24
5 November 2024
Incident
-
Equipment Class 3, even if you operate as 'Class 2'
This case study examines a DP incident on an equipment class 3 multi-purpose vessel while operating in good conditions.
DPE 03/24
5 November 2024
Incident
-
Line of sight
This case study covers events onboard a DP equipment class 2 vessel whilst holding position in a turbine field, with three position reference systems selected into DP – DGPS, HPR and Fanbeam.
DPE 03/24
5 November 2024
Incident
-
DP Drill Scenario
DP emergency drill scenarios are included to assist DP vessel management, DPOs / Engineers, and ETOs in conducting DP drills onboard.
DPE 03/24
5 November 2024
Incident
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.