Non-routine lift leads to thruster incapacity
- DP Event
- Published on 29 November 2016
- Generated on 11 June 2026
- DPE 04/16
- 1 minute read
Undesired event
Jump to:
The lift had not been properly planned for the object being lifted – there was a failure to recognise that the mattress was not a routine lift.
Comments
The vessel maintained position throughout. The lift had not been properly planned or risk assessed for the object being lifted. There was a failure to recognise that the mattress was not a routine lift. A generic lift plan was used which did not cover this specific lift.
Considerations
- Danger of recognising an operation as routine, when it isn’t, and therefore using inappropriate standard procedures and risk assessments.
- A situational awareness of the whole operation, involving all departments, is required.
- Was there pressure to perform the task on an inappropriate vessel heading?
- One thruster was on standby – if the lift had been identified as non-standard then possibly all thrusters would have been online.
- DP red alert was used by the DP operator (DPO), although redundancy had not been compromised. It is unknown whether this was in line with the activity specific operating guidelines (ASOG), however the DPO considered that the event had potential to escalate and therefore decided to initiate red alert.
Latest DP incidents
-
Think twice. Press once!
On a DP equipment class 2 supply vessel engaged in drilling, an incident occurred due to lack of operational knowledge
DPE 01/26
11 May 2026
Incident
-
Network issues, not a thing of the past
A DP equipment class 3 vessel was engaged in saturation diving activities, with two divers in the water when this DP incident occurred.
DPE 01/26
11 May 2026
Incident
-
All swept up
A DP equipment class 2 vessel was engaged in rock placement operations, within close proximity to a structure, when this event occurred.
DPE 01/26
11 May 2026
Undesired event
-
Hybrid system won't accept load
A DP equipment class 2 vessel was engaged in operations whilst holding position on auto DP, when this undesired event occurred
DPE 01/26
11 May 2026
Undesired event
-
DP drill scenario – Loss of main DP system UPS
The objective of this scenario is to identify risks and impacts of losing the main DP system uninterruptible power supply, possibilities to reduce that risk and suitable actions to be taken if such an occurrence happened.
DPE 01/26
11 May 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.