Vessel specific familiarisation programmes and operation manuals should make allowances for crew members not being familiar with systems.
Comments
Both DPOs had several years’ experience but with a different DP control system where it is common to stop the vessel during a move by reducing speed to 0.0kts.
However, on the system fitted to this vessel a retardation factor is used so speed is reduced automatically when the stop request is made.
Setting a speed at 0.0kt led to an unstable situation. The master instructed DPOs to keep a minimum speed on DP of 0.1kts and not set speed to 0.0kts.
Considerations
- Vessel specific familiarisation programmes and operation manuals should capture and make allowance for crew members not being familiar with systems. Each system/vessel has peculiarities which must be taught and learned by the crew onboard.
- The DP system manufacturer should be involved as it should not be possible for the operator to apply a valid setting which then causes an unstable DP system.
- It is recognised practice to slow down during a move, but it is not considered good practice to use zero speed.
- The use of the present position would maintain the vessel in the wanted position.
Latest DP incidents
-
Watch what you are pressing
While transiting away from a wind farm, the Master of a DP equipment class 2 vessel observed that the vessel was operating in Backup Mode and queried this with the bridge team and attending electrician
DPE 03/26
19 October 2026
Incident
-
The domino effect
The event demonstrates the importance of maintaining the approved DP power configuration, addressing known defects before equipment is relied upon during DP operations, and ensuring DP personnel understand how changes to the generating arrangement can affect redundancy and failure propagation
DPE 03/26
19 October 2026
Incident
-
Lost in calibration
During activity associated with calibration of a vessel Vertical Reference Unit (VRU), the DP control system experienced degradation of its attitude reference arrangement. Shortly afterwards, the vessel generated an Off Position Warning followed by an Off Position Alarm
DPE 03/26
19 October 2026
Incident
-
The UPS and downs
While a vessel was transiting in DP mode, the DPO observed the loss of Gyros 2 and 3 together with alarms from a 230V backup power supply. The telephone system remained powered but was inoperable.
DPE 03/26
19 October 2026
Incident
-
DP drill scenario – Consequence Analysis Class DP2 & DP3
DP drill scenario – Consequence Analysis Class DP2 & DP3
DPE 03/26
19 October 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.