Unreliable component causes an undesired event
- DP Event
- Published on 25 February 2020
- Generated on 14 August 2025
- DPE 01/20
- 1 minute read
Undesired event
Jump to:
Though redundancy is a must in DP 2/3 designs, component quality may impact the likelihood of such DP events occurring.

Comments
Investigation found that a 24v bridge rectifier supplying voltage to the main generator switchboard breakers one and two had burned out.
The age and quality of the rectifier was thought to be the main reason for failure. Planned maintenance routines were updated and shared with the fleet. It was recognised that the system was vulnerable due to a single 24v bridge rectifier supplying the entire port switchboard.
Considerations
The vessel validated that it could maintain position following the worst-case failure of a complete switchboard. Though redundancy is a must in DP 2/3 designs, component quality may impact the likelihood of such DP events occurring.
Latest DP incidents
-
Always be prepared – Erroneous relative GPS heading input jeopardises follow target operations
Always be prepared – Erroneous relative GPS heading input jeopardises follow target operations
DPE 02/25
1 August 2025
Incident
-
Printer compatibility
This undesired event occurred on a DP Class 3 drillship, whilst operating in open bus configuration and undertaking drilling operations.
DPE 02/25
1 August 2025
Undesired event
-
Inadvertent act causes loss of DP, once again!
While vessel was recovering scrap metal using an ROV and crane, an alarm was triggered, but the DPO could not silence it
DPE 02/25
1 August 2025
Incident
-
Beware the solitons
An equipment class 2 pipelay vessel was engaged in pipelay operations in an area known for solitons
DPE 02/25
1 August 2025
Undesired event
-
DP drill scenario
DP emergency drill scenarios are included to assist DP vessel management and DPOs / Engineers and ETOs to conduct DP drills onboard.
DPE 02/25
1 August 2025
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.