How a DP vessel hit a wind turbine, in an update previously shared by the Marine Safety Forum.
Overview
After a transfer of four technicians to a wind turbine, the vessel was positioned just outside the 200-meter exclusion zone for standby. The next task was to pick up the same technicians when they had completed the work they had planned.
The OOW moved the vessel from the turbine to outside exclusion zone in DP surge mode. Just outside the exclusion zone, the vessel was turned to have stern on the weather, vessel was then in a ‘drift on’ position. On completion of turn, the OOW activated auto DP by ‘double tapping’ the auto DP button, but not confirming that the vessel indeed was in full auto DP before leaving the DP desk to deal with other duties. The OOW was at the time alone on the bridge. The Vessel was still in DP surge mode and by the help of the current, the vessel drifted towards the wind turbine and made contact just six minutes later. The vessel had a speed of 1.1 knots at the time of contact.
The vessel hit the wind turbine with the helideck perimeter netting and the bridge wing on port side of the vessel. The incident did not result in any personal injuries, and only minor damage to turbine, and vessel. No technical issues were identified during the investigation of this incident.
Why did it happen?
- OOW failed to comply with procedures and industry guidelines.
- OOW did not confirm that full auto DP was activated after double tap of the button on joystick.
- OOW was alone on bridge.
- OOW decided to deal with some administrative task while alone on bridge.
- Vessel placed in a drift on position.
Actions
The incident was fully investigated, and a corrective action plan established including but not limited to:
- A review of Bridge operations procedures with emphasis on bridge routines.
- A review of Bridge operations training Module one and two.
Conclusions
- The incident raises a concern regarding the robustness of the double push method of confirmation.
- After requesting an action, an operator should always confirm it by remaining situationally aware.
- Bridge manning levels should be in accordance with Guidelines for the Design and Operation of DP Vessels (IMCA M103), section 3.8.
- Personnel in the report are referred to as Officer of the Watch (OOW) and not DP Operators (DPO). Key DP personnel should have training and experience in accordance with Guidance for the Training & Experience of Key DP Personnel (IMCA M117).
View the full safety alert from the Marine Safety Forum.
Latest DP incidents
-
Watch what you are pressing
While transiting away from a wind farm, the Master of a DP equipment class 2 vessel observed that the vessel was operating in Backup Mode and queried this with the bridge team and attending electrician
DPE 03/26
19 October 2026
Incident
-
The domino effect
The event demonstrates the importance of maintaining the approved DP power configuration, addressing known defects before equipment is relied upon during DP operations, and ensuring DP personnel understand how changes to the generating arrangement can affect redundancy and failure propagation
DPE 03/26
19 October 2026
Incident
-
Lost in calibration
During activity associated with calibration of a vessel Vertical Reference Unit (VRU), the DP control system experienced degradation of its attitude reference arrangement. Shortly afterwards, the vessel generated an Off Position Warning followed by an Off Position Alarm
DPE 03/26
19 October 2026
Incident
-
The UPS and downs
While a vessel was transiting in DP mode, the DPO observed the loss of Gyros 2 and 3 together with alarms from a 230V backup power supply. The telephone system remained powered but was inoperable.
DPE 03/26
19 October 2026
Incident
-
DP drill scenario – Consequence Analysis Class DP2 & DP3
DP drill scenario – Consequence Analysis Class DP2 & DP3
DPE 03/26
19 October 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.