Dropped object near-miss
- Safety Flash
- Published on 17 August 2009
- Generated on 13 December 2024
- IMCA SF 12/09
- 3 minute read
Jump to:
A member has reported an incident in which an object was dropped whilst being lowered to divers on the seabed.
What happened?
The vessel was working in waters over 100m depth when a stainless steel toolbox was being ‘routinely’ deployed to divers on the seabed. The deployment of the toolbox was stopped at 98 m (the short mark) and the divers were advised to retrieve it. However, on arrival at the pennant hook they reported the toolbox missing.
A search for the toolbox was made using an ROV and it was found on the seabed directly below the initial deployment point, from where it was recovered to deck. No one was injured and no equipment was damaged.
The incident was immediately reported to the offshore construction manager, who temporarily suspended operations. Initial inspection of the toolbox, the deployment pennant and hook onboard the vessel rigger did not identify any defects. However, the toolbox had been deployed by attaching it to the crane pennant hook by a section of long link chain bolted to the toolbox.
What were the causes?
Investigation revealed that the small diameter long link chain had passed through the wear gap in the hook when the toolbox was transiting through the splash zone, allowing the toolbox to drop.
The hook was certified and the wear was within design and wear specification limits.
The company noted that:
- The incident had the potential to cause serious injury to divers and was reportable to local regulatory authorities.
- The incident happened during a ‘routine’ task where ‘custom and practice’ methods were accepted without challenge.
- The toolboxes were manufactured in-house and not fabricated to any design criteria or control processes. No engineering drawings were available.
- Important factors not considered during the fabrication of the toolboxes included:
- Lifting accessory requirements
- Effects of splash zone dynamics
- There was no certification or safe working load of the lifting points or chain.
- The type of long link chain being used was unsuitable for deployment.
- Laying the chain over the throat of a hook was improper rigging practice.
- Lifting accessory requirements
- Neither the requirements of an existing risk assessment nor company control processes were complied with.
- Perception and awareness of the potential risks involved in this task were low:
- Failure to recognise the toolbox as a lifting accessory.
- Failure to recognise that part of the lifting equipment was uncertified, not properly designed or fit for the purpose of lifting operations.
- Failure to recognise the toolbox as a lifting accessory.
- Worksite safety culture was not fully effective:
- Improper rigging practices were employed.
- Deployment method was not challenged by rigging team or worksite supervisors.
- Improper rigging practices were employed.
IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of the entire offshore industry.
The effectiveness of the IMCA Safety Flash system depends on the industry sharing information and so avoiding repeat incidents. Incidents are classified according to IOGP's Life Saving Rules.
All information is anonymised or sanitised, as appropriate, and warnings for graphic content included where possible.
IMCA makes every effort to ensure both the accuracy and reliability of the information shared, but is not be liable for any guidance and/or recommendation and/or statement herein contained.
The information contained in this document does not fulfil or replace any individual's or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.