DESIGN for the hyperbaric reception facility (HRF) forming part of a hyperbaric evacuation system (HES)

  • Recommended Practice
  • Revision 1 - June 2026

 

This document provides comprehensive guidance on the design, inspection, and maintenance of Hyperbaric Reception Facilities (HRF) as part of a Hyperbaric Evacuation System (HES) for the offshore diving industry.
 

Contents

Part 1: Guidance 

  • Introduction 

  • List of acronyms 

  • The competent person 

  • Responsibilities 

  • Planned maintenance systems (PMS) 

  • Key features of this document 

  • Completing the document 

  • References

 

Part 2:  Detail sheets

  • Record of inspections

  • Index to detail sheets

  • Section 1 – General safety 

  • Section 2 – HRF compression chamber 

  • Section 3 – HRU handling arrangements and interfaces 

  • Section 4 – HRF life support control 

  • Section 5 – Compressors, pumps, etc.  

  • Section 6 – High pressure gas storage


Revision

  • Rev. 1 - June 2026
    Annual review and continued alignment of lifting and rigging terminology with industry standards
  • Rev. 0.1 - October 2018
    Detail sheet, section 3, item 1.1 to 1.3 updated to harmonise industry guidance and practice
  • Rev. - October 2014
    Initial publication
  • Rev. 0.2 -
    Correction of distances in first bullet of Section 1.4