Connection failure during lifting operation

What happened?

On a windfarm installation vessel, there was a connection failure during operations. During lowering and rotating of the Vibro Lifting Tool (VLT) into the skidding frame for the pile upending process, the spliced-eye connected on the VLT pad eye slowly opened up. The tugger line sprung toward the winch with low energy and fell on the deck. There were no injuries.

To guide the equipment onto the skidding frame, a tugger line was connected to the VLT by means of a self spliced-eye. The tugger line was made of HMPE (High Modulus Polyethylene) spooled on the dedicated deck winch.

What went right

An exclusion zone had been established and personnel involved were not in the line of fire. The Vibro Lifting Tool was already inside the guide of the skidding frame and the insertion of the VLT could be completed without consequences.

What went wrong

The incident investigation could not identify the exact root causes, however the following causes have been considered as contributing to the event:

  • Amount of force applied to the tugger line;
    • The tugger line arrangements/connections weren’t engineered
  • Quality of the tugger line splice:
    • The spliced eyes were prepared on board by the crew;
    • Written instructions from the manufacturer for a high performance splice of a 12 strand rope was available on board;
    • The crew experienced in splicing could not demonstrate having received formal training;
    • The quality of the splice wasn’t checked against the written instruction;
    • The splice was covered with duct tape and therefore impossible to inspect and to notice any partial damage/excessive wear/fatigue;
    • The spliced-eye was choked on the VLT’s pad eye without use of a shackle, resulting in a small bending radius where the fibre rope is wrapped around the edges of the pin hole and pad-eye plate increasing the risk of damage to the rope and the spliced eye.

Our member took the following actions:

  • Ensured that splices are only made by competent, qualified and trained personnel;
  • Ensured crew were aware that the Maximum Breaking Load (MBL) of a tugger line is reduced by applying a spliced-eye;
  • Splices in general should not be covered by tape as it prevents regular visual inspection, use the original equipment manufacturer protection covers instead;
  • Spliced ropes should be part of the vessel maintenance regime as per manufacturer’s instructions;
  • Avoided the choking of tugger lines, using suitable shackles instead.

Members may wish to refer to

Safety Event

Published: 23 November 2022
Download: IMCA SF 26/22

Relevant life-saving rules:
IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding [email protected] to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.