- Enter the IMCA Awards 2024: We\'re looking for outstanding Safety, Sustainability, and GHG projects.
- IP Code: Mandatory Code enters into force on 1 July. Make sure your company is up to speed with the changes.
- Early Bird tickets available for the IMCA Global Summit 2024. 3-4 December, Utrecht, Netherlands. Members can save £400.
- Discover how we are helping Members reduce emissions: Explore the ProjectGHG hub now.
- Now booking. Join the Lifting and Rigging community at our Technical Seminar in Amsterdam. Thursday 12 September 2024
- Now booking. Underwater Ship Husbandry Seminar. 10 October 2024, Singapore.
Hand injury whilst using pillar drill
What happened
The Marine Safety Forum (MSF) has published an alert in which someone was injured whilst using a pillar drill. An experienced engineer was changing out a drill bit on a tower drill in the engine room workshop. While doing so he inadvertently operated the wrong handle and started the drill. The engineer was wearing gloves to carry out this task and as the drill turned the glove caught and turned with the drill bit, trapping his hand inside and causing a hand injury.
He was sent ashore for treatment.
What went wrong/causes
The subsequent investigation highlighted several safety critical points, a selection of which are noted below:
- The drill had multi-function controls (including clutch speed, gears, slow and fast operation, on/off switches) none of which were actually marked to indicate their purpose;
- By its design, the emergency stop button for the drill did not clearly identify to the operator when it was engaged or deactivated;
- There was no ‘green light’ (or similar indicator) to show when the equipment was ‘energised’.
Any modification of equipment should only be done after consultation and agreement with the manufacturer to ensure the modification does not adversely interfere or affect any of the other functions of the drill.
Lessons learnt/actions taken
- The company reporting the incident introduced ‘drill familiarisation’ to the engineers’ induction;
- A full and comprehensive risk assessment should be carried out for the use of all engine room equipment;
- Engineers intending to use the equipment should be fully familiar with those risk assessments and comply with their requirements;
- IMCA notes that in many countries there are regulatory requirements (the Provision and Use of Work Equipment Regulations (PUWER) in the UK) which should have been applied with regard to equipment control markings.
Note: A more recent model of the same drill incorporates a safety feature where the drill cannot be operated if the drill guard is in the open position. Such safety features should be function-checked to ensure they are fully operational before carrying out any drill changes.
Members may wish to review the following incident:
Safety Event
Published: 2 August 2017
Download: IMCA SF 19/17
IMCA Safety Flashes
Submit a Report
IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding [email protected] to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.
IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.
IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.