- Enter the IMCA Awards 2024: We\'re looking for outstanding Safety, Sustainability, and GHG projects.
- IP Code: Mandatory Code enters into force on 1 July. Make sure your company is up to speed with the changes.
- Early Bird tickets available for the IMCA Global Summit 2024. 3-4 December, Utrecht, Netherlands. Members can save £400.
- Discover how we are helping Members reduce emissions: Explore the ProjectGHG hub now.
- Now booking. Join the Lifting and Rigging community at our Technical Seminar in Amsterdam. Thursday 12 September 2024
- Now booking. Underwater Ship Husbandry Seminar. 10 October 2024, Singapore.
Hot water fitting failure results in 3m loss of depth in diving bell
What happened?
Whilst the diving bell was on the surface, pre-dive bell checks were being completed by the Bellman, when it was observed by the Dive Supervisor and Bellman that the bell was losing pressure.
The Dive Supervisor began to blowdown the bell to compensate for the loss of pressure. The Bellman lowered the bell door to isolate the diving bell from the chamber complex. The Bellman then proceeded to close all emergency valves in the bell and the Deck Diver closed all corresponding external bell valves. The pressure loss was stopped, and it was determined that a fitting had failed on the hot water distribution system. The Bellman made the bell safe and returned to the system; the bell was then surfaced for repairs.
Upon further investigation, it was established that the D2 hot water fitting (see picture below) which connects the isolation valve was cracked. This opened a leak path via the crack to atmosphere.
The actions taken by the Dive Team clearly demonstrated the effectiveness of conducting training and drills.
What went wrong? What were the causes?
- The failure of the fitting is believed to have been caused by the impact sustained from a diver’s bail out bottle making contact with the unprotected fittings at the manifold;
- The bell was completely refurbished during a dry docking in 2011;
- There were no records of the fittings being replaced in the company planned maintenance system (PMS);
- The age of the damaged fittings could not be determined. It was not known if the fittings were replaced after the 2011 dry dock.
What actions were taken? What lessons were learned?
- Review similar existing fittings to verify if there has been any impact damage and also if there is the potential for impact damage;
- Ensure all critical components are recorded in PMSs and that they also meet the requirements of Code of practice for the initial and periodic examination, testing and certification of diving plant and equipment.
Safety Event
Published: 25 April 2019
Download: IMCA SF 08/19
IMCA Safety Flashes
Submit a Report
IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding [email protected] to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.
IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.
IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.