- Enter the IMCA Awards 2024: We\'re looking for outstanding Safety, Sustainability, and GHG projects.
- IP Code: Mandatory Code enters into force on 1 July. Make sure your company is up to speed with the changes.
- Early Bird tickets available for the IMCA Global Summit 2024. 3-4 December, Utrecht, Netherlands. Members can save £400.
- Discover how we are helping Members reduce emissions: Explore the ProjectGHG hub now.
- Now booking. Join the Lifting and Rigging community at our Technical Seminar in Amsterdam. Thursday 12 September 2024
- Now booking. Underwater Ship Husbandry Seminar. 10 October 2024, Singapore.
Person struck and injured during lifting operations
What happened
The incident occurred during decommissioning activities on board a spar, where a fire water pump skid had to be removed. It was gouged out from the top of spar in accordance with the decommissioning plan, but during the initial lift, it remained partially attached.
The crew stopped work and exchanged the rigging for a more robust solution. During the second lift attempt, the skid unexpectedly came free and made contact with an adjacent nitrogen vessel, which had previously been cut 95% loose. The sudden and unplanned release of energy led to the nitrogen vessel tank striking the injured person, who was standing in the line of fire. He fell backwards and hit his head on a diagonal bracing, causing him to lose his helmet as he fell down. The injured person was transferred back to the vessel, where a medivac was waiting to transport him to a hospital onshore.
What went wrong
The investigation revealed that:
- The skid was still attached to the deck of the spar by inner/underneath welds, which were unknown during the work preparations;
- The decommissioning project had been prepared in a short time frame, which had an major impact on resources;
- There was no appropriate Control of Work nor Management of Change before the second lift attempt;
- Some objections / feedback given by crew members before proceeding with the second attempt, had not been acted upon.
Lessons
- Allocate enough time and resources to perform project preparations;
- Ensure that Control of Work and Management of Change processes are rigorously applied in order to identify unknown hazards and mitigate any potential risks;
- LISTEN when concerns are raised;
- STOP when things are not going according to plan;
- Take the time required to REASSESS the situation with your boss and with your colleagues before proceeding.
Members may wish to refer to:
Safety Event
Published: 19 March 2024
Download: IMCA SF 06/24
IMCA Safety Flashes
Submit a Report
IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding [email protected] to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.
IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.
IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.