- Enter the IMCA Awards 2024: We\'re looking for outstanding Safety, Sustainability, and GHG projects.
- IP Code: Mandatory Code enters into force on 1 July. Make sure your company is up to speed with the changes.
- Early Bird tickets available for the IMCA Global Summit 2024. 3-4 December, Utrecht, Netherlands. Members can save £400.
- Discover how we are helping Members reduce emissions: Explore the ProjectGHG hub now.
- Now booking. Join the Lifting and Rigging community at our Technical Seminar in Amsterdam. Thursday 12 September 2024
- Now booking. Underwater Ship Husbandry Seminar. 10 October 2024, Singapore.
Subcontractor ROV control room damaged by fire
What happened?
An unmanned ROV control room container, located on the deck of accommodation jack-up, caught fire. The fire team extinguished the on-board fire without any injury to personnel. However, the ROV control room, as well as the ‘suitcase ROV’ (buoyancy fairing and chassis) were badly damaged.
What went wrong? What were the causes?
- The temporary container was not adequately fitted with fire protection. Only one battery-operated smoke detector and two portable extinguishers were in place;
- The layout of equipment and materials within the container, including the presence of oily rags, created a fire risk which was not identified or managed during mobilisation or pre-use inspections. There was no evidence of ROV System audit/pre-mobilisation checklists being completed;
- A portable air-conditioning (AC) unit that was being used within the container was not fit for purpose. The portable AC unit (that was fitted with a 13A fuse) was incorrectly connected using a British-to-M type adaptor, connected to a 16A outlet. An electrical fault from this connection was found to be the most likely source of the fire.
What lessons were learned?
- Scope of work requirements issued to subcontractors should include project specific requirements and industry standards relating to the electrical safety and fire protection of portable electric equipment;
- Ensure that all third-party electrical equipment is inspected upon mobilisation to the vessel and confirmed fit for purpose, prior to use;
- Site inspections and safety inspections should include checking the condition of portable electrical equipment and electrical connections.
Members may wish to refer to:
Safety Event
Published: 27 February 2019
Download: IMCA SF 03/19
IMCA Safety Flashes
Submit a Report
IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding [email protected] to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.
IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.
IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.