- Enter the IMCA Awards 2024: We\'re looking for outstanding Safety, Sustainability, and GHG projects.
- IP Code: Mandatory Code enters into force on 1 July. Make sure your company is up to speed with the changes.
- Early Bird tickets available for the IMCA Global Summit 2024. 3-4 December, Utrecht, Netherlands. Members can save £400.
- Discover how we are helping Members reduce emissions: Explore the ProjectGHG hub now.
- Now booking. Join the Lifting and Rigging community at our Technical Seminar in Amsterdam. Thursday 12 September 2024
- Now booking. Underwater Ship Husbandry Seminar. 10 October 2024, Singapore.
Two near miss incidents with a risk of scalding
Seahealth.DK has kindly shared this safety alert with IMCA.
Incident 1: Blowing boilers
What happened: A heavy rain of scalding water from the funnel fell down on the boat deck when the engine department was blowing the boilers. The possible consequences would have been major, had crew been on the boat deck below the chimney at the time. The engine room crew were unaware that blowing of the boilers could cause a drop down of scalding water from the chimney.
Lesson learnt: This matter of ‘blowing of the boilers’ had been discussed before and the engine room crew on board had already acknowledged the hazard, but the learning had not been implemented into daily work and routines. Constant reminders were required as time goes by, basic safety issues could easily be forgotten.
Incident 2: Maintenance ends in an almost scalding situation
What happened: Crew were carrying out maintenance on the vessel’s engine, involving fitting protective shields around two cylinders to prevent the escape of pressurised hot gas. Work on the shield for the second cylinder proved more complex than expected. When fitting the second shield the cooling water pipe was dislodged and the hot water poured out and almost scalded a crew member.
Cause: An engineer removed the bolts to a cooling water pipe to make more space available. While moving the shield the engineer dislodged the cooling pipe.
Learning: Management of change: revaluate the risks presented by a job as it becomes more complex. Don’t rush hazardous work. Isolate engine-room systems to increase safety. Ensure all crew involved in maintenance are aware of how the task should be completed.
Members may wish to refer to the following similar incidents:
Safety Event
Published: 25 October 2017
Download: IMCA SF 27/17
IMCA Safety Flashes
Submit a Report
IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding [email protected] to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.
IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.
IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.