Day Signal mast broke off and fell to deck

  • Safety Flash
  • Published on 22 January 2024
  • Generated on 18 February 2026
  • IMCA SF 02/24
  • 3 minute read

The Day Signal mast on the roof of the wheelhouse broke off and part of it weighing 35kg, fell 16m to the main deck.

What happened?

On a offshore field support vessel waiting on poor weather and experiencing high winds, the Day Signal mast on the roof of the wheelhouse broke off and part of it weighing 35kg, fell 16m to the main deck.

Day Signal mast broke off and fell to deck diagram
Day Signal mast
Broken day signal mast

The weather was deteriorating and Hs (Significant Wave Height) was over 3m. The bridge team had discussed lowering the Day Signal but agreed that the wind and vessel movement could cause an increased and unnecessary risk for working on the roof of the wheelhouse. It was decided to leave the Day Signal in the raised position. The weather continued to deteriorate and the wind increased to 45-50 knots, gusting 60 knots. Later that day, a loud slamming noise was heard on the bridge. Deck lighting revealed that the Day Signal mast had broken off and was lying on the main deck. Owing to the weather situation the decision was made to leave the broken signal mast unsecured on deck until the weather improved. No-one was harmed.

What went right?

  • The bridge team took account of the wind and weather conditions and wisely opted not to do a job which would have put people at risk.
  • The on-duty deck officer had closed the back deck – restricting access to outside areas owing to the risk from the weather – and this meant that no-one was around at the time.  

What went wrong/what were the causes?

  • The mast was made of lightweight Aluminium in order for it to be light enough to raised and lowered manually.
  • The mast design  was considered sufficient to withstand the forces from high winds.
  • The mast had not been identified as a potential dropped object.

Actions taken

  • Reviewed procedures for closing the back deck during bad weather, to ensure sufficient barriers or warnings are in place when required.
  • Includes Day Signal Mast in Dropped Object survey. Implemented additional securing wiring.
  • Check for similar items onboard, for example, Helideck Windsock Mast, and include in Dropped Object survey if necessary.
  • Review maintenance and inspection regime on Aluminium masts or similar. 

Day Signal is a requirement of the Collision Convention on the International Regulations for Preventing Collisions at Sea –  COLREGs. It shows that a vessel has “Restricted Manoeuvrability”.

On this vessel, the Day Signal is normally a rigid type, permanently installed and raised/lowered by use of a hinged system and a hand cranked winch.

Latest Safety Flashes:

Fall from height during mooring due to rope tension reaction

Rope became entangled with the propellor during mooring operations of a tanker causing the operator to lose balance and fall onto the lower platform.

Read more
Missing protection – progressive wear on hydraulic hoses causes damage

During an inspection, several hydraulic hoses and fuel hoses were found in direct contact with surrounding surfaces and sharp edges.

Read more
Small engine room fire – flammable object ignited

While ramping up the starboard main engine, a small flammable foreign object ignited.

Read more
Positive: damage to Fast Rescue Craft davit wire rope caught before failure

During routine checks, it was observed that the FRC davit wire rope had a visible fracture at the socket termination area.

Read more
BSEE: Miscommunication and trapped pressure causes injury during valve maintenance

BSEE has published Safety Alert 509 relating to a gas release incident on an offshore platform.

Read more

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of the entire offshore industry.

The effectiveness of the IMCA Safety Flash system depends on the industry sharing information and so avoiding repeat incidents. Incidents are classified according to IOGP's Life Saving Rules.

All information is anonymised or sanitised, as appropriate, and warnings for graphic content included where possible.

IMCA makes every effort to ensure both the accuracy and reliability of the information shared, but is not be liable for any guidance and/or recommendation and/or statement herein contained.

The information contained in this document does not fulfil or replace any individual's or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.

Share your safety incidents with IMCA online. Sign-up to receive Safety Flashes straight to your email.