• Hybrid system won't accept load

    A DP equipment class 2 vessel was engaged in operations whilst holding position on auto DP, when this undesired event occurred

    DPE 01/26

    11 May 2026

    Undesired event

  • All swept up

    A DP equipment class 2 vessel was engaged in rock placement operations, within close proximity to a structure, when this event occurred.

    DPE 01/26

    11 May 2026

    Undesired event

  • Network issues, not a thing of the past

    A DP equipment class 3 vessel was engaged in saturation diving activities, with two divers in the water when this DP incident occurred.

    DPE 01/26

    11 May 2026

    Incident

  • Think twice. Press once!

    On a DP equipment class 2 supply vessel engaged in drilling, an incident occurred due to lack of operational knowledge

    DPE 01/26

    11 May 2026

    Incident

  • DP drill scenario – Loss of main DP system UPS

    The objective of this scenario is to identify risks and impacts of losing the main DP system uninterruptible power supply, possibilities to reduce that risk and suitable actions to be taken if such an occurrence happened.

    DPE 01/26

    11 May 2026

    Drill Scenario