Bad connection causes loss of DGNSS
- DP Event
- Published on 2 June 2017
- Generated on 27 October 2026
- DPE 02/17
- 1 minute read
Observation
Jump to:
There was water ingress at the L-Band connector to the antenna on the vessel's mast.
Comments
After all the checking, it was found that there was water ingress at the L-Band connector to the antenna on the mast. This was dried and cleaned. The connectors were properly sealed with self-bonding electrical tape and cable ties.
Considerations
- This observation reinforces the need for good practice conducting field entry/arrival DP checks making sure all DP systems are operational and healthy.
- It is unclear why the laser-based reference system was not in use but it is assumed the system was not immediately available due to distance or shadowing.
- Several recent reports indicate the use of only two enabled position reference systems (PRS), these are often both DGNSS. It cannot be stressed enough that a mixture of PRS should be used.
- Regular checks of connections which are exposed to the environment need to be carried out and included in planned maintenance systems.
Latest DP incidents
-
The domino effect
The event demonstrates the importance of maintaining the approved DP power configuration, addressing known defects before equipment is relied upon during DP operations, and ensuring DP personnel understand how changes to the generating arrangement can affect redundancy and failure propagation
DPE 03/26
19 October 2026
Incident
-
Lost in calibration
During activity associated with calibration of a vessel Vertical Reference Unit (VRU), the DP control system experienced degradation of its attitude reference arrangement. Shortly afterwards, the vessel generated an Off Position Warning followed by an Off Position Alarm
DPE 03/26
19 October 2026
Incident
-
Watch what you are pressing
While transiting away from a wind farm, the Master of a DP equipment class 2 vessel observed that the vessel was operating in Backup Mode and queried this with the bridge team and attending electrician
DPE 03/26
19 October 2026
Incident
-
DP drill scenario – Consequence Analysis Class DP2 & DP3
DP drill scenario – Consequence Analysis Class DP2 & DP3
DPE 03/26
19 October 2026
Drill Scenario
-
The UPS and downs
While a vessel was transiting in DP mode, the DPO observed the loss of Gyros 2 and 3 together with alarms from a 230V backup power supply. The telephone system remained powered but was inoperable.
DPE 03/26
19 October 2026
Incident
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.