Bad connection causes loss of DGNSS
- DP Event
- Published on 2 June 2017
- Generated on 21 May 2026
- DPE 02/17
- 1 minute read
Observation
Jump to:
There was water ingress at the L-Band connector to the antenna on the vessel's mast.
Comments
After all the checking, it was found that there was water ingress at the L-Band connector to the antenna on the mast. This was dried and cleaned. The connectors were properly sealed with self-bonding electrical tape and cable ties.
Considerations
- This observation reinforces the need for good practice conducting field entry/arrival DP checks making sure all DP systems are operational and healthy.
- It is unclear why the laser-based reference system was not in use but it is assumed the system was not immediately available due to distance or shadowing.
- Several recent reports indicate the use of only two enabled position reference systems (PRS), these are often both DGNSS. It cannot be stressed enough that a mixture of PRS should be used.
- Regular checks of connections which are exposed to the environment need to be carried out and included in planned maintenance systems.
Latest DP incidents
-
Think twice. Press once!
On a DP equipment class 2 supply vessel engaged in drilling, an incident occurred due to lack of operational knowledge
DPE 01/26
11 May 2026
Incident
-
Network issues, not a thing of the past
A DP equipment class 3 vessel was engaged in saturation diving activities, with two divers in the water when this DP incident occurred.
DPE 01/26
11 May 2026
Incident
-
All swept up
A DP equipment class 2 vessel was engaged in rock placement operations, within close proximity to a structure, when this event occurred.
DPE 01/26
11 May 2026
Undesired event
-
Hybrid system won't accept load
A DP equipment class 2 vessel was engaged in operations whilst holding position on auto DP, when this undesired event occurred
DPE 01/26
11 May 2026
Undesired event
-
DP drill scenario – Loss of main DP system UPS
The objective of this scenario is to identify risks and impacts of losing the main DP system uninterruptible power supply, possibilities to reduce that risk and suitable actions to be taken if such an occurrence happened.
DPE 01/26
11 May 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.