Cooling pipe leak threatens main switchboard
- DP Event
- Published on 29 March 2017
- Generated on 19 November 2026
- DPE 01/17
- 2 minute read
Observation
Jump to:
A failure of a plug on a seawater cooling pipe for the AC compressors resulted in flooding in the incinerator room.
Comments
A failure of a plug (old decommissioned cooling line for fridge compressors) on seawater cooling pipe for the Ac compressors resulted in flooding in the incinerator room (the water level was about 2cm depth) with small ingression of water in the engine control room on top of main 440V switchboard through a cable penetration.
The small water ingression (water dripping onto switchboard) was deflected by the design of the switchboard cover (class approved design) with a small quantity of water collecting on top. The quantity of water on top of the switchboard was so small that no immediate action was necessary to remove or control it during the incident. The top of the switchboard was dried after the leak was stopped and accumulated water had been removed from the incinerator room above.
Due to the desire to inspect inside the switchboard, with the vessel on standby but inside the 500m zone, the decision was taken to move outside the 500m zone as a precaution.
The vessel continued operations but remained outside the 500m.
Considerations
- The good practice of moving outside the 500m zone is noted.
- Decommissioning of pipework by removal rather than plugging is the preferred method.
- With only one motion reference unit (MRU) on line its failure would affect the stability of all position reference systems selected to the DP system.
- Submission of DP observations, as learning opportunities, is much appreciated by members of the IMCA Marine DP Committee.
Latest DP incidents
-
Watch what you are pressing
While transiting away from a wind farm, the Master of a DP equipment class 2 vessel observed that the vessel was operating in Backup Mode and queried this with the bridge team and attending electrician
DPE 03/26
19 October 2026
Incident
-
The domino effect
The event demonstrates the importance of maintaining the approved DP power configuration, addressing known defects before equipment is relied upon during DP operations, and ensuring DP personnel understand how changes to the generating arrangement can affect redundancy and failure propagation
DPE 03/26
19 October 2026
Incident
-
Lost in calibration
During activity associated with calibration of a vessel Vertical Reference Unit (VRU), the DP control system experienced degradation of its attitude reference arrangement. Shortly afterwards, the vessel generated an Off Position Warning followed by an Off Position Alarm
DPE 03/26
19 October 2026
Incident
-
The UPS and downs
While a vessel was transiting in DP mode, the DPO observed the loss of Gyros 2 and 3 together with alarms from a 230V backup power supply. The telephone system remained powered but was inoperable.
DPE 03/26
19 October 2026
Incident
-
DP drill scenario – Consequence Analysis Class DP2 & DP3
DP drill scenario – Consequence Analysis Class DP2 & DP3
DPE 03/26
19 October 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.