DP drill scenario – Loss of seawater cooling pump redundancy

  • DP Event
  • Published on 1 September 2026
  • Generated on 1 September 2026
  • DPE 02/26
  • 1 minute read

Drill Scenario

DP emergency drill scenarios are included to assist DP vessel management and DPOs / Engineers and ETOs to conduct DP drills onboard. The intent is that the template can be used on any DP vessel, so specific details regarding the technical outcome are not included. The benefit of using this template is to monitor and learn from the human reactions of key DP personnel. It is also important that the crew are familiar with various DP system set-ups including their failure modes.

Refer to IMCA M273 A guide to conducting DP drills and ensuring preparedness for DP failures, Appendix A.

Exercise scenario – Loss of seawater cooling pump redundancyExercise scenario – Loss of seawater cooling pump redundancy.


The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.

IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.

Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.