Observation
Jump to:
Overview
The DP equipment class 2 vessel was not on station at the time, but in standby, receiving system updates with the OEM technician onboard. The updates were being carried out within an anchorage area.
The conditions were good with two of the three generators connected in an open bus configuration, all four thrusters running and two DGNSS selected to DP.
What happened?
During an update in the Follow Target Mode, the crew noticed an anomaly with joystick control. When the joystick controller was in the 0 position a command of 10% power ahead was being given.
Findings
The crew, along with the technician, consulted the joystick manual:
- Following the update, the joystick had become uncalibrated.
- The section on calibrating the joystick was located, and the crew proceeded to recalibrate it.
- This was not the first time this had occurred. When the crew reviewed the records, they found that the joystick required recalibration after every update.
Conclusion
This is a simple observation that could easily have gone unreported to IMCA and been dismissed as a routine update; however, much can be learned from simple events.
The lesson is not the calibration issue itself, but the need to understand system behaviour following software changes and to ensure vessel personnel know how to verify and restore normal functionality.
It is imperative that companies have a robust management of change process in place that includes an OEM software change process and an appropriate test methodology.
Primary references
- IMCA M103 – Guidelines for the design and operation of dynamically positioned vessels
- IMCA M117 – Code of practice for the training and experience of key DP personnel
- IMCA HSS003 – Guidance for the initial and refresher familiarisation of vessel crews
- IMCA HSS001 – Guidelines for management of change
Latest DP incidents
-
Holding position, losing references
While approaching a turret-moored, weather-vaning offshore installation (FPSO), in preparation for cargo operations, a DP equipment class 2 vessel experienced significant rolling of up to 15–20° due to a long-period swell close to the vessel’s natural roll period, resulting in a resonance effect
DPE 02/26
1 September 2026
Observation
-
New equipment, unexpected consequences
During the operation, a loss of DGNSS correction signals was experienced across multiple vessel DGNSS units.
DPE 02/26
1 September 2026
Incident
-
A chain of small failures leads to a major consequence
While conducting cargo operations on DP a vessel experienced a partial blackout caused by an unexpected shutdown of generator 3
DPE 02/26
1 September 2026
Incident
-
DP drill scenario – Loss of seawater cooling pump redundancy
Exercise scenario – Loss of seawater cooling pump redundancy
DPE 02/26
1 September 2026
Drill Scenario
-
Know your equipment, or at least where to find the answers
During an update in the Follow Target Mode, the crew noticed an anomaly with joystick control.
DPE 02/26
1 September 2026
Observation
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.