Getting fall arrest equipment right

What happened

A crew person was changing the lamp bulbs on the vessel mast, working at a height of around 4m above the deck. The person was wearing a full set of PPE including a certified safety harness with a lanyard equipped with a shock absorber. There was a Permit to Work in place.

However, the  total length of all this safety equipment had not been properly taken into account.

  • 1.75m: the safety lanyard shock absorber;
  • 2m: the lanyard itself;
  • 1.9m: the approximate height of the person being protected.

This added up to 5.65m, whereas the person was working 4m above the deck. In the case of a fall from height, the fall arrest equipment would have been of no use and the person could have fallen to deck unprotected. He did not fall – no-one was injured.

What went right and wrong?

  • Right: the crew person was wearing fall arrest equipment and there was a Permit to Work in place – some incomplete assessment of risk had at least taken place;
  • Wrong:
    • The risk assessment was not adequate; no-one thought to check that the proposed work height relative to the length of the fall arrest equipment;
    • No-one noticed or considered that the fall arrest safety lanyard was clearly marked “Minimum 6m clearance distance” (see image);

Lessons

Correctly calculate your fall arrest!

Members may wish to refer to

Safety Event

Published: 29 August 2023
Download: IMCA SF 21/23

Relevant life-saving rules:
IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding [email protected] to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.