This was a simple case of Key DP personnel not being included in the ASOG process.
Considerations
This was a simple case of Key DP personnel not being included in the ASOG process, the ASOG should clearly indicate how critical machinery should be treated whilst carrying out the industrial mission of the vessel. If intrusive fault finding is required, then a change of status would/should be required. The engineer did not consider the consequences of taking the thruster into local control.
This event highlights the need for good operational planning and a detailed accurate ASOG. IMCA M 220 Guidance on operational activity planning, contains guidance on this subject. Section 7,Qualification and Knowledge Requirements of Key DP Personnel (IMCA M117) – gives guidance for Key DP Personnel.
Although not related to the event the number of references seems inadequate. IMO MSC Circ. 645 and IMO MSC.1 Circ. 1580 guidance documents state that for DP 2 or 3 operations:
There is a requirement for three independent position references simultaneously available during operation based on two different principles. See IMCA Information Note No.1567 which was published in July 2021.
Latest DP incidents
-
Think twice. Press once!
On a DP equipment class 2 supply vessel engaged in drilling, an incident occurred due to lack of operational knowledge
DPE 01/26
11 May 2026
Incident
-
Network issues, not a thing of the past
A DP equipment class 3 vessel was engaged in saturation diving activities, with two divers in the water when this DP incident occurred.
DPE 01/26
11 May 2026
Incident
-
All swept up
A DP equipment class 2 vessel was engaged in rock placement operations, within close proximity to a structure, when this event occurred.
DPE 01/26
11 May 2026
Undesired event
-
Hybrid system won't accept load
A DP equipment class 2 vessel was engaged in operations whilst holding position on auto DP, when this undesired event occurred
DPE 01/26
11 May 2026
Undesired event
-
DP drill scenario – Loss of main DP system UPS
The objective of this scenario is to identify risks and impacts of losing the main DP system uninterruptible power supply, possibilities to reduce that risk and suitable actions to be taken if such an occurrence happened.
DPE 01/26
11 May 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.