Action error – Was an ASOG in place?
- DP Event
- Published on 13 December 2021
- Generated on 6 October 2026
- DPE 04/21
- 1 minute read
Observation
Jump to:
This was a simple case of Key DP personnel not being included in the ASOG process.
Considerations
This was a simple case of Key DP personnel not being included in the ASOG process, the ASOG should clearly indicate how critical machinery should be treated whilst carrying out the industrial mission of the vessel. If intrusive fault finding is required, then a change of status would/should be required. The engineer did not consider the consequences of taking the thruster into local control.
This event highlights the need for good operational planning and a detailed accurate ASOG. IMCA M 220 Guidance on operational activity planning, contains guidance on this subject. Section 7,Qualification and Knowledge Requirements of Key DP Personnel (IMCA M117) – gives guidance for Key DP Personnel.
Although not related to the event the number of references seems inadequate. IMO MSC Circ. 645 and IMO MSC.1 Circ. 1580 guidance documents state that for DP 2 or 3 operations:
There is a requirement for three independent position references simultaneously available during operation based on two different principles. See IMCA Information Note No.1567 which was published in July 2021.
Latest DP incidents
-
Know your equipment, or at least where to find the answers
During an update in the Follow Target Mode, the crew noticed an anomaly with joystick control.
DPE 02/26
1 September 2026
Observation
-
New equipment, unexpected consequences
During the operation, a loss of DGNSS correction signals was experienced across multiple vessel DGNSS units.
DPE 02/26
1 September 2026
Incident
-
A chain of small failures leads to a major consequence
While conducting cargo operations on DP a vessel experienced a partial blackout caused by an unexpected shutdown of generator 3
DPE 02/26
1 September 2026
Incident
-
Holding position, losing references
While approaching a turret-moored, weather-vaning offshore installation (FPSO), in preparation for cargo operations, a DP equipment class 2 vessel experienced significant rolling of up to 15–20° due to a long-period swell close to the vessel’s natural roll period, resulting in a resonance effect
DPE 02/26
1 September 2026
Observation
-
DP drill scenario – Loss of seawater cooling pump redundancy
Exercise scenario – Loss of seawater cooling pump redundancy
DPE 02/26
1 September 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.