This was a simple case of Key DP personnel not being included in the ASOG process.
Considerations
This was a simple case of Key DP personnel not being included in the ASOG process, the ASOG should clearly indicate how critical machinery should be treated whilst carrying out the industrial mission of the vessel. If intrusive fault finding is required, then a change of status would/should be required. The engineer did not consider the consequences of taking the thruster into local control.
This event highlights the need for good operational planning and a detailed accurate ASOG. IMCA M 220 Guidance on operational activity planning, contains guidance on this subject. Section 7,Qualification and Knowledge Requirements of Key DP Personnel (IMCA M117) – gives guidance for Key DP Personnel.
Although not related to the event the number of references seems inadequate. IMO MSC Circ. 645 and IMO MSC.1 Circ. 1580 guidance documents state that for DP 2 or 3 operations:
There is a requirement for three independent position references simultaneously available during operation based on two different principles. See IMCA Information Note No.1567 which was published in July 2021.
Latest DP incidents
-
Watch what you are pressing
While transiting away from a wind farm, the Master of a DP equipment class 2 vessel observed that the vessel was operating in Backup Mode and queried this with the bridge team and attending electrician
DPE 03/26
19 October 2026
Incident
-
The domino effect
The event demonstrates the importance of maintaining the approved DP power configuration, addressing known defects before equipment is relied upon during DP operations, and ensuring DP personnel understand how changes to the generating arrangement can affect redundancy and failure propagation
DPE 03/26
19 October 2026
Incident
-
Lost in calibration
During activity associated with calibration of a vessel Vertical Reference Unit (VRU), the DP control system experienced degradation of its attitude reference arrangement. Shortly afterwards, the vessel generated an Off Position Warning followed by an Off Position Alarm
DPE 03/26
19 October 2026
Incident
-
The UPS and downs
While a vessel was transiting in DP mode, the DPO observed the loss of Gyros 2 and 3 together with alarms from a 230V backup power supply. The telephone system remained powered but was inoperable.
DPE 03/26
19 October 2026
Incident
-
DP drill scenario – Consequence Analysis Class DP2 & DP3
DP drill scenario – Consequence Analysis Class DP2 & DP3
DPE 03/26
19 October 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.