Power distribution

  • DP Event
  • Published on 12 May 2016
  • Generated on 5 December 2024
  • DPE 01/16
  • 1 minute read

Undesired event

With only two diesel generators online, the DPO must be fully aware of the consequences of a worst case failure (WCF).

DPE 16.01 – Power distribution – Flowchart

Considerations

  • With only two diesel generators online, the DPO must be fully aware of the consequences of a worst case failure (WCF).

The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.

IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.

Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.