A failure of a plug on a seawater cooling pipe for the AC compressors resulted in flooding in the incinerator room.

Comments
A failure of a plug (old decommissioned cooling line for fridge compressors) on seawater cooling pipe for the Ac compressors resulted in flooding in the incinerator room (the water level was about 2cm depth) with small ingression of water in the engine control room on top of main 440V switchboard through a cable penetration.
The small water ingression (water dripping onto switchboard) was deflected by the design of the switchboard cover (class approved design) with a small quantity of water collecting on top. The quantity of water on top of the switchboard was so small that no immediate action was necessary to remove or control it during the incident. The top of the switchboard was dried after the leak was stopped and accumulated water had been removed from the incinerator room above.
Due to the desire to inspect inside the switchboard, with the vessel on standby but inside the 500m zone, the decision was taken to move outside the 500m zone as a precaution.
The vessel continued operations but remained outside the 500m.
Considerations
- The good practice of moving outside the 500m zone is noted.
- Decommissioning of pipework by removal rather than plugging is the preferred method.
- With only one motion reference unit (MRU) on line its failure would affect the stability of all position reference systems selected to the DP system.
- Submission of DP observations, as learning opportunities, is much appreciated by members of the IMCA Marine DP Committee.
Latest DP incidents
-
Complete the job
Whilst connected to a turbine, an alarm was generated on the DP operator station, ‘Unbalanced load on SWBD 1’.
DPE 01/25
16 January 2025
Undesired event
-
How is your alignment?
Loss of the CyScan position reference system generated a reference system failure alarm and moments later the vessel began to lose position with the accompanying alarms.
DPE 01/25
16 January 2025
Incident
-
Beware your centre of rotation
The stern thrusters started to oscillate which transferred to an oscillating motion of the vessel and high forces were being used to try to maintain position.
DPE 01/25
16 January 2025
Incident
-
A-Tension
Whilst pipelaying in shallow water, the vessel experienced a tension sensor failure on one tensioner.
DPE 01/25
16 January 2025
-
DP Drill Scenario
DP emergency drill scenarios are included to assist DP vessel management, DPOs / Engineers, and ETOs in conducting DP drills onboard.
DPE 01/25
16 January 2025
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.