During vessel position adjustments, an unattended gangway was caught between berth and vessel, and damaged.

What happened?

During cargo operations in port, a vessel’s aft mooring lines were found tightened. The port coordinator and third-party riggers were informed about temporarily suspending the operation. After the engines were ready, control was taken from the bridge, and the gangway was recovered onboard. While the deck crew was loosening the mooring lines, the port riggers that stayed onboard reinstalled the gangway without informing the vessel’s crew and then left the vessel. During subsequent vessel position adjustments, the unattended gangway was caught between berth and vessel, and damaged. No-one was injured. 

What went wrong?

  • There was a failure in communication between the port coordinator, third-party riggers, and the vessel bridge. The bridge crew and deck crew were not informed of the gangway re-installation, and there was subsequent uncoordinated vessel movement.
  • Unauthorized Gangway Handling – the third-party riggers re-installed the gangway without permission or proper communication.
  • There was no control or supervision of the third-party riggers onboard the vessel.

The investigation also noted the following:

  • There was a man overboard risk: the gangway could potentially be used while the vessel was moving.
  • There were conflicting statements regarding whether the gangway barrier chains were secured. CCTV footage was unclear and could not confirm the actual condition.

Lessons to learn

  • Vessel gangways are critical safety equipment and should only be handled by authorized vessel crew under an order given from the bridge.
  • During re-berthing or gangway removal, it may be appropriate to have third-party contractors and visitors disembark unless full control over those remaining onboard can be guaranteed.
  • Gangway access during vessel movement or when mooring lines are slackened, regardless of operational pressure, should not be permitted.
  • Gangway barrier chains/access gates should be closed after gangway removal on deck.
  • All shore/third-party personnel should complete vessel sign in & sign-off procedures while accessing & leaving vessel.

Latest Safety Flashes:

Three crane incidents

A member reports three separate but related crane incidents involving cranes.

Read more
Finger trapped and injured while working on heavy equipment

A third-party technician suffered a pinch injury to the right index finger.

Read more
Machinery damaged through improper maintenance technique

During an audit on an offshore vessel it was observed that the fuel oil purifier failed to self-discharge.

Read more
Gangway damaged after unauthorised re-installation

During vessel position adjustments, an unattended gangway was caught between berth and vessel, and damaged.

Read more
Some positive findings

Controlled Contractor Induction Process, Effective Gangway Induction and Documentation Control, and Safe Positioning and Good Communication During Lifting Operations.

Read more

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of the entire offshore industry.

The effectiveness of the IMCA Safety Flash system depends on the industry sharing information and so avoiding repeat incidents. Incidents are classified according to IOGP's Life Saving Rules.

All information is anonymised or sanitised, as appropriate, and warnings for graphic content included where possible.

IMCA makes every effort to ensure both the accuracy and reliability of the information shared, but is not be liable for any guidance and/or recommendation and/or statement herein contained.

The information contained in this document does not fulfil or replace any individual's or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.

Share your safety incidents with IMCA online. Sign-up to receive Safety Flashes straight to your email.