Bad connection causes loss of DGNSS
- DP Event
- Published on 2 June 2017
- Generated on 12 September 2026
- DPE 02/17
- 1 minute read
Observation
Jump to:
There was water ingress at the L-Band connector to the antenna on the vessel's mast.
Comments
After all the checking, it was found that there was water ingress at the L-Band connector to the antenna on the mast. This was dried and cleaned. The connectors were properly sealed with self-bonding electrical tape and cable ties.
Considerations
- This observation reinforces the need for good practice conducting field entry/arrival DP checks making sure all DP systems are operational and healthy.
- It is unclear why the laser-based reference system was not in use but it is assumed the system was not immediately available due to distance or shadowing.
- Several recent reports indicate the use of only two enabled position reference systems (PRS), these are often both DGNSS. It cannot be stressed enough that a mixture of PRS should be used.
- Regular checks of connections which are exposed to the environment need to be carried out and included in planned maintenance systems.
Latest DP incidents
-
Holding position, losing references
While approaching a turret-moored, weather-vaning offshore installation (FPSO), in preparation for cargo operations, a DP equipment class 2 vessel experienced significant rolling of up to 15–20° due to a long-period swell close to the vessel’s natural roll period, resulting in a resonance effect
DPE 02/26
1 September 2026
Observation
-
Know your equipment, or at least where to find the answers
During an update in the Follow Target Mode, the crew noticed an anomaly with joystick control.
DPE 02/26
1 September 2026
Observation
-
A chain of small failures leads to a major consequence
While conducting cargo operations on DP a vessel experienced a partial blackout caused by an unexpected shutdown of generator 3
DPE 02/26
1 September 2026
Incident
-
New equipment, unexpected consequences
During the operation, a loss of DGNSS correction signals was experienced across multiple vessel DGNSS units.
DPE 02/26
1 September 2026
Incident
-
DP drill scenario – Loss of seawater cooling pump redundancy
Exercise scenario – Loss of seawater cooling pump redundancy
DPE 02/26
1 September 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.