Non-routine lift leads to thruster incapacity
- DP Event
- Published on 29 November 2016
- Generated on 9 September 2026
- DPE 04/16
- 1 minute read
Undesired event
Jump to:
The lift had not been properly planned for the object being lifted – there was a failure to recognise that the mattress was not a routine lift.
Comments
The vessel maintained position throughout. The lift had not been properly planned or risk assessed for the object being lifted. There was a failure to recognise that the mattress was not a routine lift. A generic lift plan was used which did not cover this specific lift.
Considerations
- Danger of recognising an operation as routine, when it isn’t, and therefore using inappropriate standard procedures and risk assessments.
- A situational awareness of the whole operation, involving all departments, is required.
- Was there pressure to perform the task on an inappropriate vessel heading?
- One thruster was on standby – if the lift had been identified as non-standard then possibly all thrusters would have been online.
- DP red alert was used by the DP operator (DPO), although redundancy had not been compromised. It is unknown whether this was in line with the activity specific operating guidelines (ASOG), however the DPO considered that the event had potential to escalate and therefore decided to initiate red alert.
Latest DP incidents
-
Holding position, losing references
While approaching a turret-moored, weather-vaning offshore installation (FPSO), in preparation for cargo operations, a DP equipment class 2 vessel experienced significant rolling of up to 15–20° due to a long-period swell close to the vessel’s natural roll period, resulting in a resonance effect
DPE 02/26
1 September 2026
Observation
-
Know your equipment, or at least where to find the answers
During an update in the Follow Target Mode, the crew noticed an anomaly with joystick control.
DPE 02/26
1 September 2026
Observation
-
A chain of small failures leads to a major consequence
While conducting cargo operations on DP a vessel experienced a partial blackout caused by an unexpected shutdown of generator 3
DPE 02/26
1 September 2026
Incident
-
New equipment, unexpected consequences
During the operation, a loss of DGNSS correction signals was experienced across multiple vessel DGNSS units.
DPE 02/26
1 September 2026
Incident
-
DP drill scenario – Loss of seawater cooling pump redundancy
Exercise scenario – Loss of seawater cooling pump redundancy
DPE 02/26
1 September 2026
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.