Non-routine lift leads to thruster incapacity
- DP Event
- Published on 29 November 2016
- Generated on 9 May 2025
- DPE 04/16
- 1 minute read
Undesired event
Jump to:
The lift had not been properly planned for the object being lifted – there was a failure to recognise that the mattress was not a routine lift.

Comments
The vessel maintained position throughout. The lift had not been properly planned or risk assessed for the object being lifted. There was a failure to recognise that the mattress was not a routine lift. A generic lift plan was used which did not cover this specific lift.
Considerations
- Danger of recognising an operation as routine, when it isn’t, and therefore using inappropriate standard procedures and risk assessments.
- A situational awareness of the whole operation, involving all departments, is required.
- Was there pressure to perform the task on an inappropriate vessel heading?
- One thruster was on standby – if the lift had been identified as non-standard then possibly all thrusters would have been online.
- DP red alert was used by the DP operator (DPO), although redundancy had not been compromised. It is unknown whether this was in line with the activity specific operating guidelines (ASOG), however the DPO considered that the event had potential to escalate and therefore decided to initiate red alert.
Latest DP incidents
-
Complete the job
Whilst connected to a turbine, an alarm was generated on the DP operator station, ‘Unbalanced load on SWBD 1’.
DPE 01/25
16 January 2025
Undesired event
-
Beware your centre of rotation
The stern thrusters started to oscillate which transferred to an oscillating motion of the vessel and high forces were being used to try to maintain position.
DPE 01/25
16 January 2025
Incident
-
A-Tension
Whilst pipelaying in shallow water, the vessel experienced a tension sensor failure on one tensioner.
DPE 01/25
16 January 2025
-
How is your alignment?
Loss of the CyScan position reference system generated a reference system failure alarm and moments later the vessel began to lose position with the accompanying alarms.
DPE 01/25
16 January 2025
Incident
-
DP Drill Scenario
DP emergency drill scenarios are included to assist DP vessel management, DPOs / Engineers, and ETOs in conducting DP drills onboard.
DPE 01/25
16 January 2025
Drill Scenario
The case studies and observations above have been compiled from information received by IMCA. All vessel, client, and operational data has been removed from the narrative to ensure anonymity. Case studies are not intended as guidance on the safe conduct of operations, but rather to assist vessel managers, DP operators, and technical crew.
IMCA makes every effort to ensure both the accuracy and reliability of the information, but it is not liable for any guidance and/or recommendation and/or statement herein contained.
Any queries should be directed to DP team at IMCA. Share your DP incidents with IMCA online. Sign-up to receive DP event bulletins straight to your email.